Analysis NumberProject Name/DescriptionAnalysis TypeInitiation DateContact NameCase NumberDocument Completion DateRemarks
RE-2007-05Menovske Access RoadEA10/11/2006H. MatzatCACA48185 R/W over existing roads
RE-2007-08Shasta County SaleEA10/23/2006I. EmryCA 485069/27/2007Sale of 160 acres to Shasta County next to West Cental Landfill.
RE-2007-09timber haul roadEA10/24/2006H. MatzatCA 47059  
RE-2007-10timber haul roadEA10/25/2007H. MatzatCA 47920  
RE-2007-12Piezometer Placement at Indian CreekDNA11/1/2006G. Diridoni 11/6/2006BR piezomter placement.  Applicabale NEPA document CA-360-2002-08
RE-2007-17Sacramento River Bend Road Designations, Closures, Gate Installations, and Road RehabilitationEA11/20/2006K. Williams  Reviewing and designating roads for motorized vehicle use in the Bend ACEC.  Physical closure of some roads, gates, etc.
RE-2007-18Sacramento River Bend Target Shooting ClosureEA11/20/2006K. Williams  Reviewing a current emergency closure and formalizing a closure leading to FR publication.
RE-2007-19Sacramento River Bend Fence Realignments, New Fences and Fence RemovalsEA11/20/2006K. Williams  Review of existing fences and determining obsolescence, realignment needs, or need for new / additional fencing.
RE-2007-20Lost Salmon Site excavations and site protectionEA11/26/2006E. RitterN/A1/18/2007Archaeological testing, possible fencing, exotic plant removal
RE-2007-21R/W AmendmentEA11/27/2006H. MatzatCA 47058 Add 454s feet new 12Kv line and metering equipment
RE-2007-31Indian Creek Rehab. Site: Trinity River Miles 93.7 to 96.5EA1/2/2007F. Berg 5/11/2007TRRP undertaking. BLM is cooperating agency & needs separate FONSI/DR
RE-2007-33Timber Haul R/WEA1/22/2007H. MatzatCA 47359 Existing road over BLM & exclusive easements
RE-2007-38Yana Trail MaintenanceEA1/24/2007K. WilliamsN/A Maintenance of the Yana Trail including repair of old roads, installation of drainage structures, and a designed trail across Inks Creek.
RE-2007-41OHV acquisition (Keenan)EA2/8/2007H. MatzatCA-47917 Acquire 154.9 acres, Interlakes
RE-2007-44Phase 3B ModificationEA2/20/2007G. DiridoniN/A4/25/2007Incorporate most recent changes and mitigation measures
RE-2007-45Altenburg amendment roadEA2/21/2007H. MatzatCACA-42202  
RE-2007-47Alan Abbs - Sunsweet Tehama Extreme RacesEA2/21/2007A. LytleCA360-SRP-07-009  
RE-2007-49Keswick Eastside Trails PlanEA3/1/2007W. Kuntz 3/16/2007 
RE-2007-50Lower Clear Creek Greenway Management PlanEA3/1/2007W. Kuntz 10/31/2007 
RE-2007-60Phase 3B On Site Material SortingDNA4/30/2007G. Diridoni  Analyze effects of gravel sorting on site
RE-2007-63Frase Easement AcquisitionDNA5/10/2007H. MatzatCA-479165/10/2007Tiered to Coram Road Construction/Relocation EA RE-2006-38
RE-2007-64Cemetery RoadEA5/11/2007H. MatzatCACA-48984  
RE-2007-65Puckett Road Right-of-WayEA5/14/2007I. EmryCA 48934  
RE-2007-67Saeltzer Gorge Ditch Crossing and Surface RehabilitationEA5/24/2007F. Berg 6/5/2007Provide safe pedestrian xing of Ditch. Route runoff into natural drainage. Place fill into mined area.
RE-2007-73CA-49044 HWY 299 curve improvementEA6/28/2007H. Matzatca-49044  
RE-2007-83Construction of Boundary Fences between Inks Creek and Massacre FlatEA8/24/2007K. Williams   
RE-2007-84Redding BLM OHV Acquisition GrantEA8/27/2007S. Zaffarano   
Re-2007-89Lower Springs SaleEA8/28/2007S. RodriguezCA49265  
RE-2007-91Irongate Grazing RenewalEA5/30/2007C. Lentz#0142  
RE-2007-92Piney Mountain (Costa) Grazing RenewalEA5/30/2007C. Lentz#3017  
RE-2007-96Boat Launch Facilities MaintenanceEA9/19/2007G. Diridoni   
RE-2007-99Jaxon ExchangeEA9/30/2007 CA44477  
 
 
 
 

 