| Analysis Number | Project Name/Description | Initiation Date | Contact Name | Case Number | Document Completion Date | Remarks |
| DOI-BLM-CA-N060-2010-0003-DNA | Swasey Broadcast Burn | 9/30/2009 | T. Bradley | | | DNA references Swasey Plan EA. Low intensity rx fire in ACEC. |
| DOI-BLM-CA-N060-2010-0005-EA | State Parks Trail Oroville | 10/13/2009 | H. Matzat | CACA-51319 | 11/9/2009 | |
| DOI-BLM-CA-N060-2010-0006-EA | Communication site Inks Ridge | 10/29/2009 | H. Matzat | CACA-50841 | 12/17/2009 | |
| DOI-BLM-CA-N060-2010-0007-EA | Chang ROW amendment to add two buried water lines | 11/17/2009 | H. Matzat | CACA-15576 | 12/31/2009 | |
| DOI-BLM-CA-N060-2010-0008-EA | Hogsback #1, #2, #3 Competitive Sales | 11/19/2009 | I. Emry | CACA 49822, CACA 49823, CACA 49824 | 4/23/2010 | These are 3 competitive sales east of Red Bluff in the foothills along Hogsback Road. |
| DOI-BLM-CA-N060-2010-0009-EA | Lower Clear Creek Watershed - Access Improvements | 11/19/2009 | F. Berg | | 12/7/2009 | ARRA proposal to improve parking and restore, as needed, adjoining disturbed surfaces at Cloverdale Road, Honeybee Road (entry to wetlands) and China Gardens. |
| DOI-BLM-CA-N060-2010-0010-EA | Keswick Biomass & Brush Mastication Project | 11/23/2009 | W. Herzog | n/a | 4/2/2010 | ARRA project to thin approximately 90-acres of brush fields to reduce hazardous fuels and protect residual oak and conifer trees. Cut vegetation will be removed as biomass. Project planned on BLM and BOR lands. NOTE: This EA is being completed for both the Flat Creek Forestry and Shasta Defense Fire Management ARRA projects. The Flat Crk project was originally a CX but was upgraded to an EA to include fire management treatments. |
| DOI-BLM-CA-N060-2010-0013-EA | Communicatin Site Amendment SF MTN | 12/1/2009 | H. Matzat | CACA-27708 | 3/12/2010 | |
| DOI-BLM-CA-N060-2010-0014-EA | Caltrans HWY ROW, Horseshoe curve | 12/1/2009 | H. Matzat | CACA-51320 | | |
| DOI-BLM-CA-N060-2010-0016-EA | Clear Creek Greenway Goat Browsing | 12/3/2009 | T. Bradley | | 1/11/2010 | Use goat browsing and prescribed fire in the Cloverdale and Lower Clear Creek areas to reduce fuel loading, restore or maintain oak woodlands and treat exotic plants. |
| DOI-BLM-CA-N060-2010-0017-EA- | Variance Permit EA | 12/3/2009 | T. Bradley | | | Continue variance permit hazardous fuels clearing program for private homeowners to attain fire safe clearances around homes and other vulnerable improvements. |
| DOI-BLM-CA-N060-2010-0018-EA | Butte Creek Bridge Replacement | 12/7/2009 | W. Kuntz | | 2/28/2010 | Project is to replace the current Butte Creek Bridge due to age and condition. ARRA Project. 404 and 401 permits pending. No funding for this project at this time. |
| DOI-BLM-CA-N060-2010-0019-EA | Campground Forest Health | 12/7/2009 | B. Garrelts | | | Project will commercially thin insect and diseased as well as overstocked trees within BLM managed facilities. |
| DOI-BLM-CA-N060-2010-0021-EA | Clear Creek Road Frontage Rehabilitation - China Gardens Vicinity | 12/15/2009 | F. Berg | N/A | 2/22/2010 | Proposal to make the China Gardens frontage more pleasing, limit dumping, facilitate utility line maintenance and preclude unauthorized vehicle access. |
| DOI-BLM-CA-N060-2010-0022-EA | Townsend Ditch Xings Modification | 12/15/2009 | F. Berg | N/A | 2/22/2010 | Proposal to restore 4 seasonal drainage xings of the Townsend Flat Ditch roughly between the Gorge overlook and Honeybee Road. |
| DOI-BLM-CA-N060-2010-0023-EA | Grazing Renewal-Sheep Rock | 12/1/2009 | C. Lentz | 3134 | 2/20/2010 | 625 Acres (320 usable). 40 AUM's. T 43 N, R 3 W, Sec. 6 |
| DOI-BLM-CA-N060-2010-0024-DNA | Grazing Lease Renewal-Panwauket | 12/16/2009 | C. Lentz | 3132 | 4/16/2010 | Chang's irrigated pasture. 5 acres. 60 AUM's. T 32 N, R 9 W, Sec. 33 |
| DOI-BLM-CA-N060-2010-0025-EA | Grazing Lease Renewal-Hog Lake | 12/16/2009 | C. Lentz | 3123 | 8/16/2010 | 4,770 Acres. 1,855 AUM's. |
| DOI-BLM-CA-N060-2010-0026-EA | Grazing Lease Renewal-Duzel Rock and Secret Springs | 12/16/2009 | C. Lentz | 3047 and 3080 | 8/20/2010 | 1,768 Acres. 51 AUM's. |
| DOI-BLM-CA-N060-2010-0027-EA | Grazing Lease Renewal-Old Clement Ranch | 12/16/2009 | C. Lentz | 3120 | 8/20/2010 | 1,858 Acres. 163 AUM's. |
| DOI-BLM-CA-N060-2010-0028-EA | Grasing Lease Renewal-Secret Spring | 12/16/2009 | C. Lentz | 3080 | 8/20/2010 | 2,360 acres. 197 AUM's. Combined with DOI-BLM-CA-N060-0026-EA |
| DOI-BLM-CA-N060-2010-0032-EA | Mudd acquisition | 1/11/2010 | H. Matzat | | |
| DOI-BLM-CA-N060-2010-0033-EA | Frase/Beldon Acq | 1/11/2010 | H. Matzat | | 6/7/2010 | |
| DOI-BLM-CA-N060-2010-0034-EA | PG&E penstocks rebuild | 1/11/2010 | H. Matzat | CACA-51410 | | |
| DOI-BLM-CA-N060-2010-0035-EA | Goethe | 1/11/2010 | H. Matzat | CACA-51556 | | |
| DOI-BLM-CA-N060-2010-0036-EA | Jellys Ferry Bridge Replacement | 1/13/2007 | K. Williams | | | The NEPA / CEQA work is being handled by Tehama County via contract. BLM will need to review the EA and prepare and sign our own Decision Record. BLM staff work should be minimal. |
| DOI-BLM-CA-N060-2010-0037-EA | Millie Drive Shaded Fuel Break | 1/13/2010 | K. Ralston | | 1/14/2010 | This is an extension of the cut and chip project using the CCC's with AARA funding. This project is outside of the Keswick Basin so a new EA was necessary. |
| DOI-BLM-CA-N060-2010-0038-EA | Mlcoch Seep Well Right-of-Way | 1/13/2010 | I. Emry | CACA 50446 | 5/4/2010 | This is a seep well and waterline along the Trinity River at Poker Bar. |
| DOI-BLM-CA-N060-2010-0040-EA | MichCal Timber Haul Road Renewal | 1/27/2010 | H. Matzat | CACA-26595 | | |
| DOI-BLM-CA-N060-2010-0041-EA | Van Vleet Apiary permit renewal | 1/29/2010 | H. Matzat | CACA-46037 | 2/16/2010 | |
| DOI-BLM-CA-N060-2010-0043-EA | Leopardman Site Test Excavations | 2/17/2010 | E. Ritter | | 3/15/2010 | Minor archaeological test excavations in open flat for assessment of site significance regarding possible land sale |
| DOI-BLM-CA-N060-2010-0044-EA | Hog Ranch Road Salvage Pile Burn | 3/8/2010 | K. Ralston | | 3/12/2010 | For burning two salvage piles on Hog Ranch Rd in Butte Co. |
| DOI-BLM-CA-N060-2010-0045-DNA | RMP Maintenance re Easement Purchases Within Disposal Areas | 3/10/2010 | F. Berg | | 3/23/2010 | The intent is to amplify language in the Redding RMP regarding interim management needs on public land parcels identified for disposal in the RMP. It is sometimes necessary to acquire easements as means to: provide interim management actions to safeguard the values of the subject public (or neighboring) land, improve the market value and marketability of a disposal parcel, or provide access to nearby public lands identified for retention. |
| DOI-BLM-CA-N060-2010-0046-EA | PPL ROW Renewal | 3/11/2010 | H. Matzat | CACA-5458 | 4/21/2010 | Buried pwr line 170 feet on BLM, ROW renewal. |
| DOI-BLM-CA-N060-2010-0047-EA | Woody Vegetation Maintenance | 3/12/2010 | T. Bradley | | | EA to establish guidelines for use of chemical herbicides to treat resprouting shrubs and other vegetation that is targeted for removal within WUI shaded fuelbreaks, along recreational trails and adjacent to facility improvements throughout the Field Office. Request initial scoping date be established to frame issues and concerns - available dates March 29-April 2 or April 12-13. |
| DOI-BLM-CA-N060-2010-0048-EA | Indian Creek Forest Health Treatment | 3/12/2010 | T. Bradley | | | Joint forestry and fuels project in Siskiyou county involving biomass and/or timber removal aimed at improving forest health and reducing fuels. |
| DOI-BLM-CA-N060-2010-0049-EA | Ewing Resevoir Fuels Project | 3/12/2010 | T. Bradley | | | Vegetation and fuel reduction project around Ewing resevoir in Hayfork area aimed at improving oak woodland vegetation and fire potential by reducing encroachment of shrubs, small conifers. |
| DOI-BLM-CA-N060-2010-0050-EA | North Area Right-of-Way Maintenance Project | 3/12/2010 | H. Matzat | WAPA EA - March 2010 | 3/1/2010 | Reference: Final Environmental Assessment for the North Area Right-of-Way Maintenance Program, March 2010 BLM is signing a FONSI for those Public Lands affected by the WAPA (Western) North Area ROW Maintenance Program (the Proposed Action) serves to update the existing operations and maintenance (O&M) program to include all transmission lines as well as seven communication facilities into one comprehensive O&M program. |
| DOI-BLM-CA-N060-2010-0051-EA | Delaney road Right of Way | 3/15/2010 | S. Brooks | CACA 51649 | 3/24/2010 | Existing road near Magalia. |
| DOI-BLM-CA-N060-2010-0052-DNA | Lowden stream flow monitoring | 3/22/2010 | H. Matzat | CACA-51736 | | BOR Tri River Restoration monitoring site |
| DOI-BLM-CA-N060-2010-0053-EA | Oak Slough Vegetation Management | 3/19/2010 | C. Lentz | | 3/31/2010 | Using livestock for vegetation management in the old agricultural field ("bean field"). |
| DOI-BLM-CA-N060-2010-0058-DNA | Lowden stream restoration | 4/26/2010 | H. Matzat | CACA-51854 | 6/1/2010 | |
| DOI-BLM-CA-N060-2010-0065-EA | RMP Amendment to Designate Grass Valley Creek Watershed and Lower Clear Creek as Areas of Critical Environmental Concern | 4/28/2010 | | | | Draft RMP Amendment/EA being developed. Scoping has closed. |
| DOI-BLM-CA-N060-2010-0068-EA | Realignment of portions of the Yana Trail | 5/10/2010 | K. Williams | | 10/10/2010 | Most of the Yana Trail was user-created based on terrain, ownership and fencing constraints. With continued land acquisition, removal of fences on former boundary lines or grazing allotments, the trails can be placed in more logical and environmentally friendly locations. This EA analyzes these new segmants and minor realignments. |
| DOI-BLM-CA-N060-2010-0069-EA | HWY 299 west curve work | 5/12/2010 | H. Matzat | CACA-51790 | 6/29/2010 | |
| DOI-BLM-CA-N060-2010-0072-DNA | Trinity House Gulch Project TRRP | 5/17/2010 | H. Matzat | CACA-51980 | 6/1/2010 | A TRRP project |
| DOI-BLM-CA-N060-2010-0073-DNA | Reading Creek Project TRRP | 5/17/2010 | H. Matzat | CACA-51981 | 6/1/2010 | TRRP project |
| DOI-BLM-CA-N060-2010-0074-EA | Union Hill Pond Dam Stabilization | 5/17/2010 | G. Diridoni | | 7/12/2010 | |
| DOI-BLM-CA-N060-2010-0075-DNA | F. Berg Trailhead Construction | 5/26/2010 | W. Kuntz | | 5/26/2010 | The City of Redding would like to issue a encroachment permit to BLM for a parking lot associated with the F. Berg Trail. BLM will be the EP holder, Redding Foudation and McConnell Foundation will fund the construction. |
| DOI-BLM-CA-N060-2010-0077-EA | Cirby Biomass and Fuels Treatment | 6/4/2010 | B. Garrelts | | | The Project Proposes to remove commercially valuable biomass (fuelwood) as well as treat standing and down dead fuels in 70 acres within the WUI adjacent to the community of Concow, CA. |
| DOI-BLM-CA-N060-2010-0078-EA | Goethe access road | 6/10/2010 | H. Matzat | CACA-51556 | 6/25/2010 | existing access on acquired lands |
| DOI-BLM-CA-N060-2010-0079-EA | OHV Road #3 Extension | 6/17/2010 | S. Zaffarano | | | |
| DOI-BLM-CA-N060-2010-0080-EA | Middle Creek Trail Paving and Construction | 6/21/2010 | W. Kuntz | | 6/25/2010 | Preparation of roadbed for paving of the Middle Creek Trail and the old Shasta Stage Coach Road, from the Sacramento River Trail to Iron Mt. Road to Shasta County Dump Road. 300 feet of trail would be constructed from the Middle Creek railroad bed near Iron Mt. Road to a crossing on Iron Mt. Road, across from the old Shasta Stage Coach Road. |
| DOI-BLM-CA-N060-2010-0081-EA | Peterson Ridge Shaded Fuelbreak | 6/28/2010 | T. Bradley | | | Shaded fuelbreak in Siskiyou County, Scott Valley. To be included in Scott Valley Stewardship Project. |
| DOI-BLM-CA-N060-2010-0084-EA | Keswick Withdrawal | 7/16/2010 | S. Rodriguez | CA 51096 | 7/23/2010 | Pending completion of mineral report |
| DOI-BLM-CA-N060-2010-0085-EA | Miller Acquisition | 7/16/2010 | S. Rodriguez | CA51865 | 7/23/2010 | LWCF acquisition of 9 acres in the Upper Sacramento River Bend Area |
| DOI-BLM-CA-N060-2010-0088-EA | Clear Creek Long-Term Spawning Gravel Supply Project | 7/21/2010 | G. Diridoni | | | The proposed action is to extract and process mine tailing deposits to develop a long-term source of spawning-size gravel that would be available to enhance spawning habitat for Central Valley steelhead and Central Valley spring-run Chinook salmon in the reach of Clear Creek below Whiskeytown Dam. In addition to providing a source of gravel, grading operations associated with the proposed action would result in reestablishing functional floodplain surfaces and enhancing the functional values associated with aquatic, riparian, and wetland features. |
| DOI-BLM-CA-N060-2010-0089-EA | Right-of-Way Assignment Norrbom to Overman | 7/28/2010 | I. Emry | CACA 46613 | | This right-of-way is an access road on Hogsback Road being assigned to a new owner. |
| DOI-BLM-CA-N060-2010-0091-EA | Grass Valley Permanent Road Construction | 8/4/2010 | B. Garrelts | | | Construction of 0.13 mile of permanent all-season road to connect BLM lands within the Grass Valley Creek Watershed and California Hwy 299W (also includes gate installation). |
| DOI-BLM-CA-N060-2010-0097-DNA | Paradise Ridge Fuels Maintenance | 8/23/2010 | J. Strait | | 8/24/2010 | \\blm\dfs\ca\re\pub\users\jstrait\2010\Fuels\CCC Paradise Fuels |
| DOI-BLM-CA-N060-2010-0098-EA | Turnpike Forest Health Stewardship | 8/31/2010 | B. Garrelts | | | Thin from below and remove overstocked ladder fuels along county line road, between North Hoadley Peak and Lewiston Turnpike. |
| DOI-BLM-CA-N060-2010-0099-EA | Hog Lake Fence | 9/1/2010 | Nancy L. Dodson | | | Five miles of fence line replacement on the eastern side of Paynes Creek ACEC. |
| DOI-BLM-CA-N060-2010-0101-EA | Ponderosa Way Doe Mill Road Reconditioning | 9/20/2010 | W. Kuntz | | | Reconditioning and rebuilding of PWDMR, new culverts and replacement culverts. 1.5 inch gravel to be placed on road way after dozer work and regrading of prisim. |