The barren hills in the Mecca Hills Wilderness Area create an interesting pattern across this desert landscape.
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Desert cactus in bloom Dos Palmas Windmills at the base of the Santa Rosa Mountains Firefighter working a prescribed burn Bighorn Sheep
California
BLM>California>Palm Springs-South Coast>Solar Energy Projects>Palen Solar Electric Generating System>Palen Solar Electric Generating System Supplemental Draft EIS
Print Page
Palm Springs Field Office

Palen Solar Electric Generating System


SUPPLEMENTAL DRAFT EIS

This large document has been provided in sections to facilitate ease of use.  However, if your connection is slow, please be patient.

Volume 1

Volume 2, Appendix A

Volume 2, Appendix B, part 1

Volume 2, Appendix B, part 2

Volume 2 Appendices


Public Comments 
Public Comment:  The public comment period for the Supplemental Draft EIS begins on July 26, 2013 and ends on October 24, 2013.

Please contact the project manager, Frank McMenimen, at (760) 833-7150 for more information.


Historic Preservation - Section 106
A Citizen's Guide to Section 106
Reasonable and Good Faith Efforts
 
Related Links
BLM CDD Renewable Energy
Understanding the NEPA Process

Bureau of Land Management
Palm Springs - South Coast Field Office
1201 Bird Center Drive
Palm Springs, California 92262
Phone: (760) 833-7100
Fax: (760) 833-7199
Office Hours: 8:00 a.m. - 4:30 p.m., M-F
Contact us by Email
Location of Field Office