Proposed Chevron Energy Solutions Lucerne Valley Solar Project 


Chevron Energy Solutions (CES) is proposing to develop a 45-megawatt solar photovoltaic (PV) plant and associated facilities on 516 acres of federal land managed by the Bureau of Land Management (BLM). The site of CES’s proposed action is located on unincorporated land in the Mojave Desert, approximately eight miles east of Lucerne Valley in San Bernardino County, Calif.

The BLM will decide whether to approve, approve with modification, or deny issuance of a right of way (ROW) grant to CES for the proposed solar project. The decision the BLM will make is whether or not to grant a ROW and if so, under what terms and conditions, and whether to amend the California Desert Conservation Area (CDCA) land-use plan in two potential ways.

First, the Environmental Impact Statement will be used to consider whether the CDCA Plan should be amended to designate the lands as suitable or unsuitable for solar energy development. Second, CES’s proposal would reroute a portion of Zircon Road, a currently designated route of travel. Also included in the proposal is an interconnection to an existing Southern California Edison distribution line located north of the site.

For assistance in accessing Vol. II of the Chevron Energy Solutions Lucerne Valley DEIS, Please contact Greg Thomsen at (951) 697-5237.


Related Links:

FEIS Volume I Chapter 1 , Chapter 2 , Chapter 3 , Chapter 4 , Chapters 5,6,7&8
FEIS Volume II - Appendix A - Public Scoping Report , Appendix B - Emissions Calculations , Appendix C - Biological Assessment, Appendix D - Comprehensive Biological Resources AssessmentAppendices E,F&G - Cultural Resources, Paleontology, Dust Control
FEIS Volume III - Appendix H - Weed Control Plan, Appendix I - Stormwater Pollution Prevention Plan, Appendix J - Spill Prevention, Appendix K - Biological Opinion, Appendix L - Eagle Survey, Appendix M - Comment Letters, Appendix N - BLM Response to Comments, Appendix O - Hydrology
Draft EIS Vol. I
Draft EIS Vol. II
Press release 2/19/10
Federal Register Notice of Availability 2/5/10
Press Release 2/5/10
Lucerne Scoping Meeting, Powerpoint Presentation 7/29/09
Example of Ground Mounted Solar Field
Location of Proposed Lucerne Valley Solar Project
Arial View of Proposed Lucerne Valley Solar Project
View of Ground-mounted Solar Panel System Structure
Chevron Energy Solutions
Map
3/9/10 Public Meeting Powerpoint
Chevron Lucerne Valley Solar Project Fact Sheet
3/9/10 Public Meeting Transcript
Public Comments 1

Public Comments 2

Biological Opinion