U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT
Arizona
 
Dry Lake Wind Energy Project (EA AZ-410-2008-0019)
Print Page

BLM >Arizona >What We Do >Energy >Wind Energy Dry Lake Wind Project > Final Environmental Assessment


(all files are Acrobat pdf format)

  • Finding of No Significant Impact (FONSI)
  • Signed Record of Decision (DR)
  • Environmental Assessment (Oct 2008)
  • Appendix A - Figures
    • Figure 1-1 Applicant's Proposed Project
    • Figure 2-1 Wind Farm Phases
    • Figure 2-2 Phase I Preliminary Layout
    • Figure 2-3 Typical Wind Turbine Dimensions
    • Figure 2-4 Batch Plant Layout
    • Figure 2-5 Typical Single Pole 34.5 kV Transmission
    • Figure 3-1 Surface Geology
    • Figure 3-2 Holbrook Basin Geology
    • Figure 3-3 High Erodible Soils
    • Figure 3-4 Biological Hydrological Resources
    • Figure 3-5 Habitat Map
    • Figure 3-6 Land Ownership / Land Use
    • Figure 3-7 Planned Land Use
    • Figure 3-8 Potential Land Use Conflicts
  • Appendix B - Visual Resource Management
  • Appendix C - Ecological Baseline Study
  • Appendix D - Habitat Restoration
  • Disturbed Areas on Private, State, and Federal Lands - Construction
  • Frequently Asked Questions

 


 
Last updated: 10-23-2014