RDEP Final EIS

Volume 1

Front Matter

Executive Summary

Chapters 1-2. Introduction and Alternatives (4M)

Chapter 3. Affected Environment (6M)

Chapter 4. Environmental Consequences (3M)

Chapter 5. Cumulative Impacts

Chapter 6. Consultation and Coordination

Chapter 7. List of Preparers

Chapter 8. References

Glossary

Index

Volume 2

Frontmatter

Appendix A. Reasonably Foreseeable Development Scenario (2M)

Appendix B. Design Features, Required Plans, and BMPs

Appendix C. Solar and Wind Energy Assessment (6.5M)

Appendix D. Cultural History Background

Appendix E. AZ List of Noxious Weeds

Appendix F. Southwest ReGAP for AZ

Appendix G. Response to Comments (2M)


Restoration Design Energy Project