BLM > Arizona > Information Center > NEPA > 2012 Projects Log
Arizona State Office · One North Central Avenue, Suite 800 · Phoenix, AZ 85004-4427 · (602) 417-9200
Arizona Strip District Office · 345 East Riverside Drive · St. George, UT 84790 · (435) 688-3200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A000-2012-0001-DNA | CHAD'S GUIDE SERVICE HUNTING GUIDE SRP | ALL | 1/31/2012 | PENDING | NO | | JON JASPER | | |
 |
Arizona Strip Field Office · 345 East Riverside Drive · St. George, UT 84790 · (435) 688-3200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A010-2012-0001-CX | FOREST SERVICE ROAD 422A RIGHTI-OF-WAY RENEWAL | | 12/19/2011 | COMPLETED | NO | 1/13/2012 | LAURAIE FORD | | | | DOI-BLM-AZ-A010-2012-0002-CX | COMMUNICATION USES RIGHT-OF-WAY RENEWALS | | 1/13/2012 | PENDING | NO | | LAURAIE FORD | | | | DOI-BLM-AZ-A010-2012-0003-CX | GUIDED ROCK CLIMBING SRP | AREA MANAGED FOR WILDERNESS CHARACTERISTICS (LIME KILN) | 2/2/2012 | PENDING | NO | | JON JASPER | | | | DOI-BLM-AZ-A010-2012-0004-CX | CANYONEERING IN BADGER CANYON SRP | MARBLE CANYON ACEC | 2/2/2012 | PENDING | NO | | JON JASPER | | | | DOI-BLM-AZ-A010-2012-0005-CX | DRIVING TOURS TO PAIUTE CAVE AND MARBLE CANYON OVERLOOKS SRP | MARBLE CANYON ACEC | 2/2/2012 | PENDING | NO | | JON JASPER | | | | DOI-BLM-AZ-A010-2012-0006-CX | HIGHWAY EAST GRAZING PERMIT TRANSFER | SHINARUMP ACEC | 2/13/2012 | PENDING | NO | | WHIT BUNTING | | | | DOI-BLM-AZ-A010-2012-0074-EA | LIZARD ALLOTMENT GRAZING PERMIT RENEWAL | | 2/22/2012 | PENDING | YES | | BRANDON BOSHELL | | | | DOI-BLM-AZ-A010-2012-0008- | | | | | | | | | |
 |
Vermilion Cliffs National Monument · 345 East Riverside Drive · St. George, UT 84790 · (435) 688-3200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A020-2012-0001-DNA | JAMES KAY PHOTOGRAPHY SRP | PARIA CANYUON, VERMILION CLIFFS WILDERNESS | 12/6/2011 | COMPLETED | NO | 1/25/2012 | JON JASPER | | | | DOI-BLM-AZ-A020-2012-0002-CX | COSMO WHITE POCKET FILM PERMIT | | 12/12/2011 | COMPLETED | NO | 12/14/2011 | LAURIE FORD | | | | DOI-BLM-AZ-A020-2012-0003-CX | CONDOR FILM PERMIT | CONDOR RELEASE SITE | 12/13/2011 | COMPLETED | | 1/5/2012 | LAURIE FORD | | | | DOI-BLM-AZ-A020-2012-0004-EA | SUN VALLEY MINE INTERPRETATION AND PUBLIC SAFETY | WILDERNESS | 1/13/2012 | PENDING | YES | | KEN SHURTZ | | | | DOI-BLM-AZ-A020-2012-0005-CX | NATIONAL GEOGRAPHIC FILM PERMIT | | 1/26/2012 | COMPLETED | | 2/9/2012 | LAURIE FORD | | |
 |
Grand Canyon- Parashant National Monument · 91 West 1470 South · St. George, UT 84770 · (435) 688-3345 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A030-2012-0001-DNA | HIDDEN AND JACOB '06 FIRES RESEARCH | TORTOISE CRITICAL HABITAT | 10/19/2011 | COMPLETED | N/1 | 12/6/2011 | KATHLEEN HARCKSON | | | | DOI-BLM-AZ-A030-2012-0002-DNA | BROME FUNGAL BIOCONTROL RESEARCH | TORTOISE CRITICAL HABITAT | 10/19/2011 | COMPLETED | N/1 | 12/6/2011 | KATHLEEN HARCKSON | | | | DOI-BLM-AZ-A030-2012-0003-EA | SIX WILDLIFE WATER CATCHMENTS | | 11/10/2011 | PENDING | | | SHAWN LANGSTON | | | | DOI-BLM-AZ-A030-2012-0004-EA | MOSBY ALLOTMENT GRAZING PERMIT RENEWAL | | 2/22/2012 | PENDING | YES | | BRANDON BOSHELL | | | | DOI-BLM-AZ-A030-2012-0005-XX | | | | | | | | | |
Colorado River District Office · 2610 Sweetwater Avenue · Lake Havasu City, AZ 86406 · (928) 505-1200
 |
Kingman Field Office · 2755 Mission Blvd. · Kingman, AZ 86401 · (928) 718-3700 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-CO10-2012-0001-CX | Five Star X, LLC ROW AZA35784. Reservation for development of wind generation facility and a temporary meteorological test tower. | PD Lands | 10/4/2011 | CX in Progress | | | Melissa Patriquin | | | | DOI-BLM-AZ-CO10-2012-0002-CX | Five Star XV, LLC ROW AZA 35781 Reservation for development of wind generation facility. | PD Lands | 10/4/2011 | CX in Progress | | | Melissa Patriquin | | | | DOI-BLM-AZ-CO10-2012-0003-CX | Pacific Wind Development, LLC Ammene existing authorization AZA-35336 | PD Lands | 10/4/2011 | CX in Progress | | | Melissa Patriquin | | | | DOI-BLM-AZ-CO10-2012-0004-CX | Mud Springs Trash Cleanup | PD Lands | 10/6/2011 | CX Completed | | 11/9/2011 | Amanda Deeds | AZ-C010-12-0004-CX | | | DOI-BLM-AZ-CO10-2011-0005-CX | Oatman Nusiance Burro Removal | PD Lands | 10/11/2011 | CX in Progress | | | Chad Benson | | | | DOI-BLM-AZ-CO10-2012-0006-DNA | Cabelas | PD Lands | 10/17/2011 | DNA in Progress | | | Melissa Patriquin | | | | DOI-BLM-AZ-CO10-2012-0007-EA | Limestone Point Flagstone Quarry | PD Lands | 10/18/2011 | EA in Progress | | | Paul Misiaszek | | | | DOI-BLM-AZ-CO10-2012-0008-DNA | Amendment to Dolan Springs Trails | PD Lands | 10/18/2011 | Decision and DNA | | 10/20/2011 | Andy Whitefield | AZ-C010-12-0008-DNA | | | DOI-BLM-AZ-C010-2012-0009-DNA | Bighorn Release Hells Half Acre & Peoples Canyon | PD Lands | 10/19/2011 | Decision and DNA | | 11/15/2011 | Rebecca Peck | AZ-C010-12-0009-DNA | Arizona Game and Fish Department | | DOI-BLM-AZ-C010-2012-0010-CX | Gather of Nuciance Burros Havasu Area | PD Lands | 11/3/2011 | CX in Progress | | | Chad Benson | | | | DOI-BLM-AZ-C010-2012-0011-DNA | Renew BP Mohave Wind Met Tower and Wind Test Area Right-of-Way | PD Lands | 12/1/2011 | Decision and DNA | | 12/6/2011 | Melissa Warren | | | | DOI-BLM-AZ-CO10-2012-0012-EA | Joe Burkett/Eagle Mining Partnership Placer Mining Plan | PD Lands | 12/1/2011 | EA in Progress | | | Paul Misiaszek | | | | DOI-BLM-AZ-CO10-2012-0013-CX | MOHAVE COUNTY FLOOD CONTROL MONITORING DEVICE IN SILVER MOUNTAIN | PD Lands | 12/6/2011 | CX Completed | | | MELISSSA PATRIQUIN | | | | DOI-BLM-AZ-CO10-2012-0014-EA | Kingman Field Office Oil & Gas Leasing EA | PD Lands | 12/19/2011 | EA in Progress | | | Paul Misiaszek | | | | DOI-BLM-AZ-CO10-2012-0015-DNA | 2012 Wilderness Trail Re-Alignment & Maintenance_EA | PD Lands | 1/4/2012 | EA Completed | | 3/16/2012 | Ramone McCoy | AZ-C010-12-0015-EA | | | DOI-BLM-AZ-CO10-2012-0016-CX | MOHAVE COUNTY FLOOD CONTROL MONITORING DEVICE AZA-35531, AZA-35519,AZA-35527, AZA35521 | PD Lands | 1/5/2012 | CX in Progress | | | MELISSSA PATRIQUIN | | | | DOI-BLM-AZ-CO10-2012-0017-DNA | 2012 Mount Nutt Secret Pass Equestrian Access | PD Lands | 1/11/2012 | DNA Completed | | 3/14/2012 | Ramone McCoy | AZ-CO10-12-0017-DNA | | | DOI-BLM-AZ-CO10-2012-0018-CX | Assignment of communications uses leases AZA 22683, AZA 30115, AZA 30116 from JIM Vine to Global Tower Partners | PD Lands | 1/12/2012 | CX in Progress | | | Andy Whitefield | | | | DOI-BLM-AZ-CO10-2012-0019-cx | Renew Nevada Red Gravel's right-of-way for mineral material stockpiling and loading area | PD Lands | 1/12/2012 | CX Completed | | 2/23/2012 | Andy Whitefield | AZ-C010-12-0019-CX | | | DOI-BLM-AZ-CO10-2012-20-EA | ROW for Ditch AZA 34477 | PD Lands | 11/8/2011 | EA in Progress | | | MELISSSA PATRIQUIN | | | | DOI-BLM-AZ-C010-2012-21-CX | Fence construction around Historic Hualapai cemeteries in Golden Valley | PD Lands | 1/23/2012 | CX in Progress | | | Tim Watkins | | | | DOI-BLM-AZ-C010-2012-22-CX | Pipeline Allotment Transfer | PD Lands | 1/30/2012 | CX in Progress | | | Mike Blanton | | | | DOI-BLM-AZ-C010-2012-23-CX | Amendment to UNS fiber optic line authorized under an amendment to AZAR 33296 | PD Lands | 2/10/2012 | CX in Progress | | cancelled | Andy Whitefield | | | | DOI-BLM-AZ-CO10-2012-24-DNA | TUP that was presented 7/5/2011 | PD Lands | 7/5/2011 | DNA in Progress | | | Melissa Patriquin | | | | DOI-BLM-AZ-CO10-2012-25-EA | CFRA - Castle Rock Connector Trail | PD Lands & City of Kingman Lands | 2/13/2012 | EA in Progress | | | Amanda Deeds | | City of Kingman | | DOI-BLM-AZ-CO10-2012-26-EA | Range Improvement Permit for Corral on Mud Springs Allotment | PD Lands | 1/4/2012 | EA in Progress | | | Ammon Wilhelm | | None | | DOI-BLM-AZ-CO10-2012-27-EA | Issue 2 communications use leases on North Gets Peak | PD Lands | 2/21/2012 | EA in Progress | | | Andy Whitefield | | | | DOI-BLM-AZ-CO10-2012-28-EA | Renew authorizations for Communications facilities at Potato Patch II (BNSF) and South Getz Peak (Tucson Electric Power) | PD Lands | 2/21/2012 | CX in Progress | | | Andy Whitefield | | | | DOI-BLM-AZ-CO10-2012-29-CX | Nusance Burro Removal McAlister BMHMA | Private land | 2/23/2012 | CX in progress | | | Chad Benson | | | | DOI-BLM-AZ-CO10-2012-30-CX | Range Study Exclosures | PD Lands | 3/8/2012 | CX in Progress | | | Ammon Wilhelm | | | | DOI-BLM-AZ-CO10-2012-31-CX | Headless well Riparian Exclosures | PD Lands | 3/8/2012 | CX complete | | 3/14/2012 | Ammon Wilhelm | AZ-C010-12-0031-CX | | | DOI-BLM-AZ-CO10-2012-32-CX | Mohave County ROW for Sant Maria Rd. | PD Lands | 3/13/2012 | CX in Progress | | | Melissa Patriquin | | |
 |
Yuma Field Office · 2555 East Gila Ridge Road · Yuma, AZ 85365 · (928) 317-3200
Lake Havasu Field Office · 2610 Sweetwater Avenue · Lake Havasu City, AZ 86406 · (928) 505-1200
Gila District Office · 1763 Paseo San Luis · Sierra Vista, AZ 85635 · (520) 439-6400| NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-G000-2012-0001-CX | Jaguar Survey and Monitoring | southern portion of Gila District | 11/7/2011 | Pending | NA | | Marcia Radke | | |
 |
Safford Field Office · 711 14th Avenue · Safford, AZ 85546 · (928) 348-4400 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-G010-2012-0001-EA | Ivanhoe and Cement Canyon Boundary Fence | Dos Cabezas | 10/24/11 | EA in Progress | Scoping 1/20-2/3 | Proposed Decision March 20, 2012 | Gwen Dominguez/R.J. Estes | | | | DOI-BLM-AZ-G010-2012-0002-EA | Oil and gas leasing | PD | 10/25/11 | EA Cancelled | | 2/15/12 | Larry Thrasher | | | | DOI-BLM-AZ-G010-2012-0003-DNA | Dieringer Outfitters | PD | 11/14/11 | DNA Complete | | 12/7/11 | Deborah Morris | | | | DOI-BLM-AZ-G010-2012-0004-CX | Van Gausig Allotment Transfer | Safford Field Office | 11/14/11 | CX in Progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0005-EA | Browning Ranch Ramada | Mule Shoe | 11/15/11 | EA Complete | | 2/6/12 | Dan McGrew | | | | DOI-BLM-AZ-G010-2012-0006-EA | BLM Guthrie Peak Comm Site | Safford Field Office | 11/18/11 | EA in Progress | | | Ron Peru | | | | DOI-BLM-AZ-G010-2012-0007-EA | Mining Plan of Operations from St. Cloud Mining for developing their two zeolite pits AZA 35700 | PD | 11/25/11 | EA Complete | | 2/23/12 | Larry Thrasher | | | | DOI-BLM-AZ-G010-2012-0008-EA | Mining Plan of Operations from Commonwealth Gold & Silver for exploratory drilling east of Pearce AZA35787 | PD | 12/2/11 | EA Complete | | 2/7/12 | Larry Thrasher | | | | DOI-BLM-AZ-G010-2012-0009-CX | Valley Telecom Telephone Line Renewal | Aravaipa/Klondyke | 12/8/11 | CX in Progress | | | Ron Peru | | | | DOI-BLM-AZ-G010-2012-0010-DNA | National Outdoor Leadership School | PD | 12/12/11 | DNA Complete | | 1/23/12 | Deborah Morris | | | | DOI-BLM-AZ-G010-2012-0011-DNA | Erodium cictarium (Redstem Filaree) Research Site | PD-Portal, Az | 1/3/12 | DNA in Progress | | | Gwen Dominguez | | | | DOI-BLM-AZ-G010-2012-0012-CX | Little Reservoir Allotment Transfer | SFO | 1/11/12 | CX Complete | | 2/3/12 | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0013-CX | Filming of fossil excavation by the BBC | PD off Artesia Road | 1/30/12 | CX Complete | | 3/12/12 | Larry Thrasher | | | | DOI-BLM-AZ-G010-2012-0014-CX | Graham Co. Electric Coop Renewal Gas Line to Az State Prison Complex-Safford | SFO | 2/1/12 | CX Complete | | 2/28/12 | Joan Galanis | | | | DOI-BLM-AZ-G010-2012-0015-CX | Ashurst Allotment Transfer | PD | 2/3/12 | CX in Progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0016-CX | Stockton Pass Allotmen Transfer | PD | 2/3/12 | CX in Progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0017-CX | Disgen Marcou Mesa, LLC. Transmission Line | PD NE of Joseph City, Az | 2/8/12 | CX Complete | | 3/20/12 | Ron Peru | | | | DOI-BLM-AZ-G010-2012-0018-CX | HYL Allotment Transfer | PD | 2/21/12 | CX Complete | | 4/20/12 | RJ Estes | | | | DOI-BLM-AZ-G010-2012-0019-CX | 99/Day Mine Allotment Transfer | PD | 2/21/12 | CX Complete | | 4/20/12 | RJ EStes | | | | DOI-BLM-AZ-G010-2012-0020-CX | Aravaipa/Aravaipa South Transfer | PD | 2/21/12 | CX Complete | | 4/20/12 | RJ EStes | | | | DOI-BLM-AZ-G010-2012-0021-EA | Goat Camp Well | PD | 3/5/12 | EA in Progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0022-EA | Twin C Permit EA | PD | 3/12/12 | EA in Progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0023-EA | Spenazuma Permit Renewal | PD | 3/12/12 | EA in Progress | | | Gwen Dominguez | | | | DOI-BLM-AZ-G010-2012-0024-EA | Turtle Mtn CCPI EA | PD | 4/1/12 | EA in Progress | | | Amy Humphrey | | | | DOI-BLM-AZ-G010-2012-0025-CX | Sheldon Mountain Allotment Transfer | PD | 4/4/12 | CX in Progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2012-0026-CX | Graham Co. Electric Coop Electric Line Conversion to FLPMA | PD | 4/12/12 | CX in Progress | | | Joan Galanis | | |
 |
Tucson Field Office · 12661 East Broadway · Tucson, AZ 85748 · (520) 258-7200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-G020-2012-0001-CX | Renewal of ROW AZA 017317 for a 7.2/12.5 kV Elec. Dist. Line | TFO & San Pedro | 10/3/2011 | | | | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0002-EA | Sawtooth vehicle barriers and cleanup | IFNM | 10/4/2011 | | | | Darrell Tersey | | | | DOI-BLM-AZ-G020-2012-0003-EA | Mt. Bruce Grazing Lease | Las Cienegas NCA | 9/1/2011 | | | | Kristen Duarte | EA & unsigned FONSI | | | DOI-BLM-AZ-G020-2012-0004-EA | Sheep Wash Water | TFO | 10/3/2011 | EA in progress | | | Eric Baker | | | | DOI-BLM-AZ-G020-2012-0005-EA | 10 ROW's for San Carlos Irrigation existing 12.5 kV powerlines | TFO | 10/14/2011 | Draft EA | | | Linda Dunlavey | | | | DOI-BLM-AZ-G020-2012-0006-CX | Renewal of ROW AZA 013980 for Tetakusim Road | TFO | 10/17/2011 | Completed | | 10/20/2011 | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0007-CX | Renewal of ROW AZA 013954 for San Joaquin Rd. | TFO | 10/17/2011 | Completed | | 10/20/2011 | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0008-CX | Renewal of ROW AZA 016827 for Ocotillo Road | TFO | 10/17/2011 | Completed | | 10/20/2011 | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0009-CX | Renewal of ROW AZA 12451 for Hayden Comm. Site | TFO | 10/17/2011 | Completed | | 12/1/2011 | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0010-CX | Demolition of Cienega House | LCNCA | 10/24/2011 | Completed | | 10/31/2011 | JJ Swift | CX | | | DOI-BLM-AZ-G020-2012-0011-CX | Demolition of Rosetree Complex | LCNCA | 10/24/2011 | Completed | | 10/31/2011 | JJ Swift | CX | | | DOI-BLM-AZ-G020-2012-0012-DNA | Arizona National Scenic Trail Kelvin Realignment | TFO | 11/9/2011 | IN PROGRESS | | | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0013-DNA | SRP IRONWOOD FOREST NATIONAL MONUMENT TOURS | IFNM | 11/9/2011 | Completed | | 1/23/2012 | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0014 | Knob Hill Gila River fence rebuild | TFO | 11/15/2011 | IN PROGRESS | | | Kristen Duarte | | | | DOI-BLM-AZ-G020-2012-0015 | Abandoned Mine Land Remediation Projects | TFO | 11/29/2011 | IN PROGRESS | | | Keith Hughes | | | | DOI-BLM-AZ-G020-2012-0016-CX | Renewal of Expiring Right-of-way AZA 017793 for Tucson Water Department | TFO | 12/5/2011 | Completed | | 12/8/2011 | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0017-CX | Renewal of Expiring Right-of-way AZA 017845 for Pima County Real Property | TFO | 12/5/2011 | IN PROGRESS | | 12/8/2011 | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0018-EA | TFO Programmatic Vegetation Treatment | TFO | 7/1/1905 | EA IN PROGRESS | | | Darrell Tersey | | | | DOI-BLM-AZ-G020-2012-0019-CX | Mule Mountain Communication Site Renewal | San Pedro | 12/19/2011 | IN PROGRESS | | | Sandy Loomis | | | | DOI-BLM-AZ-G020-2012-0020-EA | Helvetia Water Improvements | TFO | 12/12/2011 | EA in progress | | | Eric Baker | | | | DOI-BLM-AZ-G020-2012-0021-CX | Baldwin Saginaw Mineral Materials Sale | TFO | 1/9/2012 | CX Completed | | 2/6/2012 | Daniel Moore | CX | | | DOI-BLM-AZ-G020-2012-0022-DNA | LCNCA Tamarisk Control | LCNCA | 1/9/2012 | IN PROGRESS | | | Marcia Radke | | | | DOI-BLM-AZ-G020-2012-0023-CX | Mineral Mountain javalina release | TFO | 1/10/2012 | Completed | | 1/23/2012 | Darrell Tersey | | | | DOI-BLM-AZ-G020-2012-0024-DNA | Vegetative Material Permit for Traditional Use | LCNCA | 11/1/2011 | IN PROGRESS | | | Catie Fenn | | | | DOI-BLM-AZ-G020-2012-0025-DNA | LCNCA Turkey Augmentation | LCNCA | 2/1/2012 | in progress | | | Karen Simms | | | | DOI-BLM-AZ-G020-2012-0026-CX | Installation of cattle guards, IFNM 2012 | IFNM | 2/6/2012 | in progress | | | Darrell Tersey | | | | DOI-BLM-AZ-G020-2012-0027-CX | Copper Duke Bat Gates | TFO | 2/6/2012 | CX Completed | | 2/15/2012 | Keith Hughes | | | | DOI-BLM-AZ-G020-2012-0028-CX | Bach 5204 Allotment transfer | TFO | 2/29/2012 | CX Completed | | | Eric Baker | | | | DOI-BLM-AZ-G020-2012-0029-CX | COTTONWOOD GULCH FOUNDATION SRP | TFO | 3/1/2012 | Completed | | 4/4/2012 | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0030-CX | Power Line Cattle Guard | SPRNCA | 3/5/2012 | CX Completed | | | Eric Baker | | | | DOI-BLM-AZ-G020-2012-0031-DNA | BATTLE AXE PORTAL SITE IMPROVEMENTS | TFO | 3/5/2012 | IN PROGRESS | | | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0032-CX | Wildlife Fencing at 4 locations LCNCA | LCNCA | 3/5/2012 | IN PROGRESS | | | Jeff Simms | | | | DOI-BLM-AZ-G020-2012-0033 | ANST KELVIN PORTAL SITE IMPROVEMENTS | ANST/TFO | 3/5/2012 | IN PROGRESS | | | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0034-CX | Deep Well 6211 Allotment Transfer | TFO | 3/8/2012 | CX Completed | | | Eric Baker | | | | DOI-BLM-AZ-G020-2012-0035-CX | Martinez Building Removal and Gate | TFO | 3/8/2012 | Completed | | 3/12/2012 | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0036-EA | AGUIRRE FENCE AND BARRIER PROJECT | IFNM | 3/13/2012 | IN PROGRESS | | | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0037-CX | BOX CANYON BLDG REMOVAL | TFO | 3/13/2012 | COMPLETED | | 3/28/2012 | FMENDOZA | | | | DOI-BLM-AZ-G020-2012-0038-DNA | Yucca Ash Fuel Break | TFO | 4/23/2012 | IN PROGRESS | | | Drew Atkinson | | | | DOI-BLM-AZ-G020-2012-0039-DNA | Apache ATV Tour SRP Renewal | LCNCA | 5/2/2012 | IN PROGRESS | | | Catie Fenn | | | | DOI-BLM-AZ-G020-2012-0040-DNA | SPRNCA FUDS MRS Reconnaissance | SPRNCA | 5/7/2012 | CX Completed | | | Marcia Radke | | | | DOI-BLM-AZ-G020-2012-0041-CX | HERMOSA TOURS SRP | TFO | 5/7/2012 | | | | FMENDOZA | | |
 |
Ironwood Forest National Monument * 12661 East Broadway * Tucson, AZ 85748 * Phone Number (520) 258-7200
San Pedro RNCA · 1763 Paseo San Luis · Sierra Vista, AZ 85635-4611 · (520) 439-6400
 |
Phoenix District Office · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500| NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P000-2011-001-EA | Phoenix District Integrated Weed Management Environmental Assessment | Throughout BLM Phoenix District | 10/18/2010 | EA In Progress | Scoping Meetings Occurred December 14th and 15th, 2010. Contact Amanda James at 623.580.5500 for more information | | Amanda James | | | | DOI-BLM-AZ-P000-2011-002-EA | Hassayampa/AFNM Integrated Vegetation Treatment Project | Hassayampa Field Office and Agua Fria National Monument | 3/14/2011 | EA In Progress | TBD | | Brian Achziger | | | | DOI-BLM-AZ-P000-2011-003-EA | APS Dugas-Morgan Fiber Optic Project | I-17 Corridor between Cordes Lakes and SR-74 | 5/31/2011 | Public scoping concluded September 6, 20011 | TBD | | Jim Andersen | | |
 |
Hassayampa Field Office · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P010-2012-001-CX | Renewal of a communication site right-of-way | T3N, R3W, S28 | 9/19/2011 | CX Cancelled (see DOI-BLM-AZ-P010-2011-055-CX) | | n/a | Hillary Conner | see: DOI-BLM-AZ-P010-2011-055-CX | | | DOI-BLM-AZ-P010-2012-002-CX | AZ Trail Race | Black Canyon Trail between Table Mesa Road and Black Canyon City | 9/29/2011 | CX in progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2012-003-CX | ROW assignment | T10N, R6W, S23, Lost 18, 19 | 9/27/2011 | CX Completed | | 11/28/2011 | Hillary Conner | DOI-BLM-AZ-P010-2012-003-CX | | | DOI-BLM-AZ-P010-2012-004-CX | Arizona Trail Rider Dual Sport and Adventure | near Wickenburg | 10/27/2011 | CX in progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2012-005-CX | Federal Water Right acquisition project - gauging stations | AFNM - Agua Fria River and Sycamore Creek, T11N, R3E | 10/21/2011 | CX Completed | | 11/4/2011 | Paul Sitzmann | DOI-BLM-AZ-P010-2012-005-CX | | | DOI-BLM-AZ-P010-2012-006-CX | Renewal - Temporary Use Permit for Solar Monitoring -- Big Horn | T3N, R10W, S 14 | 10/31/2011 | CX Completed | | 12/15/2012 | Kathy Depukat | DOI-BLM-AZ-P010-2012-006-CX | | | DOI-BLM-AZ-P010-2012-007-CX | Renewal - Temporary Use Permit for Solar Monitoring -- Horizon Wind Energy LLC | Hassayampa Field Office | 10/31/2011 | CX Completed | | 12/15/2012 | Kathy Depukat | DOI-BLM-AZ-P010-2012-007-CX | | | DOI-BLM-AZ-P010-2012-008-DNA | 3809 Notice & Occupancy, Bloody Basin Mining & Development | T8N, R3W, S4 | 1/27/2012 | DNA In progress | | | Dave Eddy | | | | DOI-BLM-AZ-P010-2012-009-DNA | Kilauea Crushers Picacho Operation Mineral Materials Contract | T7N, R2W, S 21, 28, 33 | 1/12/2012 | DNA In progress | | | Dave Eddy | | | | DOI-BLM-AZ-P010-2012-010-EA | Hassayampa Field Office Oil and Gas Leasing EA | | 1/15/2012 | EA In Progress | TBD | | Karen Conrath | | | | DOI-BLM-AZ-P010-2012-011-CX | Whiplash OHV Race | Boulders OHV Recreation area | 1/15/2012 | CX in progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2012-012-CX | ROW assignment | T. 12 N., R. 1 E., Section 23, S½SW¼SE¼ G&SR Meridian, Yavapai County, Arizona | 2/1/2012 | CX Completed | | | Hillary Conner | DOI-BLM-AZ-P010-2012-012-CX | | | DOI-BLM-AZ-P010-2012-013-CX | Powerline ROW -- 300 feet access to private parcel | T9N, R4W, S5,6,8 | 3/12/2012 | CX in progress | | | Hillary Conner | | | | DOI-BLM-AZ-P010-2012-014-CX | Road ROW | T9N, R4W, S5,6,8 | 3/12/2012 | CX in progress | | | Hillary Conner | | | | DOI-BLM-AZ-P010-2012-015-EA | Black Canyon Trail Copper Mountain Loop | T. 12 N., R. 3 E. Sections 19, 20, 21, 28, 30, 31, 32, and 33 | 1/1/2012 | EA Completed | Public Scoping occurred in August 2010 | 3/23/2012 | Kathy Depukat | DOI-BLM-AZ-P010-2012-015-EA | | | DOI-BLM-AZ-P010-2012-016-CX | ROW assignment | T8N, R4W, S8, S1/2NE1/4 | 3/13/2012 | CX in progress | | | Hillary Conner | | | | DOI-BLM-AZ-P010-2012-017-EA | BCNRT-Big Bug Trailhead Construction EA | Black Canyon Trail between Table Mesa Road and Black Canyon City | 3/1/2012 | EA In Progress | | | Kathy Depukat | | | | DOI-BLM-AZ-P010-2012-018-CX | Assignment and Ammendment of Communication site lease -- AZA-35918 | T3N, R3W, S27, Tract 37 | 3/30/2012 | CX in progress | | | Hillary Conner | | | | DOI-BLM-AZ-P010-2012-019-CX | Nusciance Javalina Removal | Harquahala Mountains | 1/1/2012 | CX Completed | | | Codey Carter | | | | DOI-BLM-AZ-P010-2012-020-CX | City of Phoenix Comm Site at Burnt Mountain | T2N, R8W, S8 | 5/2/2012 | CX in progress | | | Jim Andersen | | |
 |
Lower Sonoran Field Office · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P020-2012-001-CX | Land Use Permit renewal for one solar montioring station, installed by Iberdrola Renewables Incorporated in November 2008 | T4S, R9W, S19 | 10/31/2011 | CX completed | n/a | 1/3/2012 | Kathy Depukat | DOI-BLM-AZ-P020-2012-001-CX | | | DOI-BLM-AZ-P020-2012-002-DNA | Oatman Mountain Communications Site -- GovNet | T4S, R9W, S25, SE | 12/7/2011 | DNA Initiated | n/a | | JoAnn Goodlow | | | | DOI-BLM-AZ-P020-2012-003-CX | US Department of Homeland Security Border Patrol Station ROW Ammendment | T13S, R5W, S24 | 3/1/2012 | CX initiated | n/a | | Jim Andersen | | | | DOI-BLM-AZ-P020-2012-004-EA | Queen Creek Quarry Competitive Bid Mineral Material Sale | T4S, R8E, S 12SE, 13NE; T4S, R9E, S7SW, 18NW | 3/1/2012 | EA Initiated | TBD | | Karen Conrath | | | | DOI-BLM-AZ-P020-2012-005-EA | Red Mountain Mining Mineral Material Sales Contract | T2N, R6E, S24, Lots 19, 21, 23, 25-29 | 3/1/2012 | EA Initiated | Project proposal sent to nearby residents, scoping comments received | | Karen Conrath | | | | DOI-BLM-AZ-P020-2012-006-EA | Ak Chin Indian Community Direct Sale | T5S, R4E, S13 | 5/2/2012 | EA Initiated | TBD | | JoAnn Goodlow | | |
 |
Agua Fria National Monument · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P030-2012-001-CX | Pronghorn Study & Capture | AFNM | 11/28/2011 | CX Initiated | N/A | 12/12/2011 | Paul Sitzmann | DOI-BLM-AZ-P030-2012-001-CX | | | DOI-BLM-AZ-P030-2012-002-DNA | Big Bug Barrier Modification | T11N, R3E, S20 | 2/20/2012 | DNA Completed | N/A | 2/24/2012 | Paul Sitzmann | DOI-BLM-AZ-P030-2012-002-DNA | |
 |
Sonoran Desert National Monument · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P040-2012-001-CX | ATGG II Vekol Valley Road Access Right of Way | T7S, R1E, S10, 22, 27, 28, 33, 34; T8S, R10E, S3, 10, 11 (utilizing Vekol Valley Road, located south of Interstate 8 in the SDNM) | 11/28/2011 | CX Initiated | | | Matt Magaletti | | | | DOI-BLM-AZ-P040-2012-002-DNA | SDNM Vehicle Barriers Project | Near Table Top Wilderness and Interstate 8 | 12/8/2011 | DNA Completed | | | Dave Scarbrough | | | | DOI-BLM-AZ-P040-2012-003-DNA | Zaabel Special Recreation Permit | North Maricopa Mountains Area | 2/6/2012 | DNA Completed | | 3/13/2012 | Dave Scarbrough | DOI-BLM-AZ-P040-2012-003-DNA | |
 |
Legend:Area Affected - GCPNM - Grand Canyon Parashant National Monument
- VCNM - Vermilion Cliffs National Monument
- AFNM - Agua Fria National Monument
- SDNM - Sonoran Desert National Monument
- IFNM - Ironwood Forest National Monument
- LCNCA - Las Cienegas National Conservation Area
- SPRNCA - San Pedro Riparian National Conservation Area
- GBNCA - Gila Box National Conservation Area
- xxx WA - Wilderness Area
- xxx WSA - Wilderness Study Area
- xxx ACEC - Area of Critical Environmental Concern
- xxx W&SR - Wild and Scenic River Segment
- xxx NT - National Trail
- PD Land - Public Domain Land
Status - DNA in Progress - Determination of NEPA Adequacy Review
- CX in Progress - Categorical Exclusion Review
- EA in Progress - Environmental Assessment Level Analysis
- FONSI/EA available for public review - Finding of No Significant Impact/EA
- DR/FONSI/EA - Decision Record/ FONSI and EA Completed
- NOI Published - Notice of Intent to Prepare an Environmental Impact Statement Level Analysis
- DEIS in Progress - Draft EIS
- NOA for DEIS - Notice of Availability Published in the Federal Register
- FEIS in Progress - Final EIS
- NOA for FEIS - Notice of Availability Published in the Federal Register
- ROD Approved - Record of Decision
- LUPA/EA NOI Published - NOI to Prepare a Land Use Plan Amendment/EA Level Analysis
- LUPA/EA in Progress
- LUPA/FONSI/EA available for public review
- LUPA/DR/FONSI/EA - Decision Record/ FONSI and EA Completed
- LUPA/EIS NOI Published - NOI to Prepare a Land Use Plan Amendment/EIS Level Analysis
- LUPA/DEIS in Progress
- NOA for DLUPA/DEIS - NOA Published in Federal Register
- PLUPA/FEIS in Progress
- NOA for PLUPA/FEIS - NOA Published in Federal Register
- LUPA/ROD Approved
- RMP NOI Published - NOI to Prepare a Resource Management Plan/EIS
- DRMP/DEIS in Progress - Draft RMP/Draft EIS
- NOA for DRMP/DEIS - NOA Published in Federal Register
- PRMP/FEIS in Progress - Proposed RMP/Final EIS
- NOA for PRMP/FEIS - NOA Published in Federal Register
- RMP/ROD Approved
How to Get Involved:BLM encourages the public to get involved in the planning process to help determine how public lands will be managed. Involvement by everyone with an interest in public lands will help ensure the best possible plan is developed and future uses of public lands are well defined. You may participate in any of the on-going planning efforts listed above. If you have questions or would like to submit comments on a particular project, please contact the BLM Office identified above.
 |
|
|