Arizona State Office · One North Central Avenue, Suite 800 · Phoenix, AZ 85004-4427 · (602) 417-9200| NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion) * | Contact* | Links to Available Documents | | DOI-BLM-AZ-9300-2010-0001-EIS | Restoration Design Energy Project, Analysis of previously disturbed sited for potential renewable energy development | Various parcels throughout Arizona on BLM Public Domain lands and other jurisdictions. | Federal Register Notice, January 13, 2010 | DEIS In Progress | Scoping open until March 11, 2010 | | Kathy Pedrick , 602-417-9235 , kathy_pedrick@blm.gov Dennis Godfrey , 602-417-9499 , dennis_godfrey@blm.gov | BLM Project Web Site | | DOI-BLM-AZ-9300-2010-0002-CX | Extenstion of Two Existing U.S. Forest Service Withdrawals (Fred Lawrence Whipple Observatory); AZA 22647 and AZA 23294 | T. 20 S., R. 14 E., secs. 19, 22, 23, 26 and 27 | 5/10/2010 | Complete | | 8/9/2010 | Angela Mogel 602-417-9536 | |
 |
Arizona Strip District Office · 345 East Riverside Drive · St. George, UT 84790 · (435) 688-3200| NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A000-2010-0001-DNA | HUNTING GUIDES SPECIAL RECREATION PERMITS NO. 1 | | | DNA COMPLETED | | 12/9/2009 | BEAL, JABE | | | | DOI-BLM-UT-C030-2010-0002-EA | MDI RESEARCH PLOTS | (NOTE: THIS PROJECT COVERS 5 FIELD OFFICES IN 3 STATES, WITH ASFO AND GCPNM AS TWO OF THEM. | | DR/FONSI/EA | | 12/23/2009 | LEANY, KIM | | | | DOI-BLM-AZ-A000-2010-0003-DNA | HUNTING GUIDES SPECIAL RECREATION PERMITS NO. 2 | ALL OF ARIZONA STRIP DISTRICT | 6/29/2010 | DNA COMPLETED | NO | 8/31/2010 | JASPER, JON | | NO |
 |
Arizona Strip Field Office · 345 East Riverside Drive · St. George, UT 84790 · (435) 688-3200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A010-2010-0001-DNA | DIR EXPLORATION INC, REQUEST FOR OCCUPANCY CONCURRENCE | | | DNA COMPLETED | | 2/5/2010 | COX, RODY | DOI-BLM-AZ-A010-2010-001.DNA | | | DOI-BLM-AZ-A010-2010-0002-CX | MOHAVE COUNTY WEATHER STATION RIGHT-OF-WAY | | | CX COMPLETED | | 8/25/2010 | FORD, LAURIE | | | | DOI-BLM-AZ-A010-2010-0003-CX | GARKANE ENERGY COOP POWERLINE ROW RENEWAL | | | CX COMPLETED | | 3/4/2010 | BARWICK, LINDA | DOI-BLM-AZ-A010-2010-0003-CX.DM | | | DOI-BLM-AZ-A010-2010-0004-CX | GARKANE ENERGY COOP ROWS GRANTS | | | CX COMPLETED | | 3/4/2010 | BARWICK, LINDA | DOI-BLM-AZ-A010-2010-0004-CX.DM | | | DOI-BLM-AZ-A010-2010-0005-CX | FREDONIA AGRICULTURAL TRACT ROADS RIGHT-OF-WAY | | | CX COMPLETED | | 4/22/2010 | FORD, LAURIE | | | | DOI-BLM-AZ-A010-2010-0006-CX | ADDITIONAL ROUTES FOR TRI-STATE ATV JAMBOREE (1-14-10) | | | CX COMPLETED | | 3/4/2010 | JASPER, JON | DOI-BLM-AZ-A010-2010-0006-CX.DM | | | DOI-BLM-AZ-A010-2010-0007-CX | GRAMA POINT ALLOTMENT GRAZING PERMIT TRANSFER | | | CX IN PROGRESS | | | SCHOPPMANN, KEVIN | | | | DOI-BLM-AZ-A010-2010-0008-CX | TEMPORARY ROUTE CLOSURE FENCE | | | CX COMPLETED | | 4/20/2010 | JASPER, JON | | | | DOI-BLM-AZ-A010-2010-0009-CX | SUICIDE ALLOTMENT GRAZING PERMIT TRANSFER | | | CX IN PROGRESS | | | BUNTING, WHIT | | | | DOI-BLM-AZ-A010-2010-0010-CX | RIO VIRGIN TELEPHONE LINE ROW RENEWAL | | | CX IN PROGRESS | | | BARWICK, LINDA | | | | DOI-BLM-AZ-A010-2010-0011-CX | CLAY SPRING AND SUNSHINE ALLOTMENTS GRAZING PERMIT TRANSFER | NO SPECIAL DESIGNATIONS | 3/4/2010 | CX COMPLETED | | 4/15/2010 | BUNTING, WHIT | DOI-BLM-AZ-A010-2010-0011-CX | | | DOI-BLM-AZ-A010-2010-0012-CX | ELLIS ARVADA PARKING PERMIT | NO SPECIAL DESIGNATIONS | 3/8/2010 | CX COMPLETED | | 3/29/2010 | FORD, LAURIE | | | | DOI-BLM-AZ-A010-2010-0013-CX | FULLER ROAD ALLOTMENT PERMIT TRANSFER | JOHNSON SPRINGS ACEC | 4/13/2010 | CX IN PROGRESS | | | OTT, BEN | | | | DOI-BLM-AZ-A010-2010-0014-CX | PAGE ELECTRIC RIGHT-OF-WAY | NEAR FOREST SERVICE WILDERNESS T41 N, R 7 E | 4/19/2010 | CX IN PROGRESS | | | BARWICK, LINDA | | | | DOI-BLM-AZ-A010-2010-0015-CX | HACK CANYON WALK-THROUGH FENCE | IN MWC (TO PROTECT KANAB CREEK WILDERNESS) | 5/25/2010 | CX COMPLETED | | 7/15/2010 | JASPER, JON | | | | DOI-BLM-AZ-A010-2010-0016-EA | PAGE SOLAR FACILITY | NATIONAL HISTORIC TRAIL / BORDERS VCNM | 6/7/2010 | EA IN PROGRESS | YES, PLAN AMENDMENT | | FORD, LAURIE | | | | DOI-BLM-AZ-A010-2010-0017-CX | ADVENTURES AT HOUSE ROCK VALLEY SRP | VCNM & PARIA CANYON, VERMILLION CLIFFS WILDERNESS | 6/8/2010 | CX COMPLETED | | 8/3/2010 | JASPER, JON | | | | DOI-BLM-AZ-A010-2010-0018-CX | PAGE ELECTRIC RIGHT-OF-WAY REAUTHORIZATION | | 6/9/2010 | CX COMPLETED | | 8/25/2010 | FORD, LAURIE | | | | DOI-BLM-AZ-A010-2010-0019-CX | LITTLEFIELD SCHOOL DISTRICT ROAD RIGHT OF WAY AMENDMENT | 6/30/2010 | CX UNDERWAY | NO | | BARWICK, LINDA | | | | DOI-BLM-AZ-A010-2010-0020-CX | LITTLE WOLF AND PURGATORY GRAZING PERMIT TRANSFER | PORTION OF LITTLE WOLF IN GCPNM AND PAIUTE WILDERNESS | 7/15/2010 | CX COMPLETED | NO | 9/9/2010 | ROAQUE, JACQUELINE | | | | DOI-BLM-AZ-A010-2010-0021-CX | NOAA WEATHER STATION RIGHT OF WAY | | 8/23/2010 | CX COMPLETED | NO | 10/12/2010 | FORD, LAURIE | | | DOI-BLM-AZ-A010-2010-0022-CX | LOWER HURRICANE VALLEY WATER WELL PERMITS | NONE | 9/16/2010 | CX COMPLETED | NO | 10/20/2010 | FORD, LAURIE | | |
 |
Vermilion Cliffs National Monument · 345 East Riverside Drive · St. George, UT 84790 · (435) 688-3200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A020-2010-0001-EA | PROGRAMMATIC EA FOR COMMERCIAL MOTORIZED SRPs ON VCNM | | | EA available for comment thru 7/14/2010 | | | CULVER, JUDY | EA | | | DOI-BLM-AZ-A020-2010-0002-DNA | FOUR SEASONS SPECIAL RECREATION PERMIT | VCNM | 4/8/2010 | DNA COMPLETED | | 5/6/2010 | CULVER, JUDY | DOI-BLM-AZ-A020-2010-0002-DNA-DM.docx | |
 |
Grand Canyon- Parashant National Monument · 91 West 1470 South · St. George, UT 84770 · (435) 688-3345 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-A030-2010-0001-CX | MOHAVE DESERT "SEEDS OF SUCCESS" SEED COLLECTION | | | CX COMPLETED | | 3/4/2010 | HARCKSEN, KATHLEEN | CX
DM | | | DOI-BLM-AZ-A030-2010-0002-CX | MOSBY/LIME SPRING GRAZING PERMIT TRANSFER | | | CX COMPLETED | | 3/11/2010 | HUGHES, LEE | CX
DM | | | DOI-BLM-AZ-A030-2010-0003-CX | SEED BANK ANALYSIS IN BURNED CRITICAL HABITATE FOR MOJAVE DESERT TORTOISE | ONLY IN GCPNM | 5/12/2010 | CX IN PROGRESS | NO | 9/2/2010 | HARCKSEN, KATHLEEN | | USGS - APPLICANT | | DOI-BLM-AZ-A030-2010-0004-EA | PAKOON SPRINGS REHABILITATION WEEDS AND OTHER TREATMENTS | ONLY IN GCPNM | 5/13/2010 | EA COMPLETE | YES | | HARCKSEN, KATHLEEN | NOA, EA, FONSI, DR | NONE | | DOI-BLM-AZ-A030-2010-0005-DNA | MOJAVE PLANT MATERIAL DEVELOPMENT FOR REVEGETATION | TORTOISE CRITICAL HABITAT | 9/16/2010 | DNA IN PROGRESS | NO | 11/19/2010 | HARCKSEN, KATHLEEN | | |
 |
Colorado River District Office · 2610 Sweetwater Avenue · Lake Havasu City, AZ 86406 · (928) 505-1200
 |
Kingman Field Office · 2755 Mission Blvd. · Kingman, AZ 86401 · (928) 718-3700 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-C010-2010-0001-EA | Hackberry Well | PD Land | | EA in Progress | | | David Brock | | | | DOI-BLM-AZ-C010-2010-0002-CX | Mohave County Wind Farm Project Area Amendment | PD Land | | Decision and CX | | 10/21/2009 | Joyce Cook | | | | DOI-BLM-AZ-C010-2010-0003-EIS | Mohave County Wind Farm Development Apln | PD Land | | NOI Published 7/26/2010 | | | Joyce Cook | | | | DOI-BLM-AZ-C010-2010-0004-DNA | Kalamazoo Chloride Pit Mining Plan | PD land | | cancelled | | | Paul Misiaszek | | | | DOI-BLM-AZ-C010-2010-0005-CX | Assignment of r-o-w | PD Land | | CX and Decision 11/24/09 | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0006-CX | temp road access | PD Lands | | cancelled | | | John Reid | | | | DOI-BLM-AZ-C010-2010-0007-EA | Special Recreation Permit for 2010 Fools Poker Run | PD Lands | | EA in Progress | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0008-DNA | Pesticide Use Permit - SW Transmission's Topock Substation | PD Lands | | Decision and DNA 11/25/09 | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0009-DNA | 2010 Black Mountain Herd Management Area Wild Burro Gather | PD Lands | | DNA signed 12/24/09 | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0010-EA | KOW acquisition | ADOT donation | | EA in progress | | | John Reid | | | | DOI-BLM-AZ-C010-2010-0011-DNA | Special Recreation Permit for Arizona Guided Hunts | PD Lands | | Decision and DNA 2/2/10 | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0012-DNA | Cherum Peak Trail Maintenance | PD Lands | | Decision and DNA 1/12/10 | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0013-CX | Trailhead Facility Improvements | PD Lands | | Decision and CX Signed 1/13/10 | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0014-EA | Kind of livestock change on the Gold Basin, Big Ranch & Quail Spr. Allotments | PD Lands | | EA in progress | | | Mike Blanton | | | | DOI-BLM-AZ-C010-2010-0015-EA | Kind of livestock change on the Walapai Ranch Allotment | PD Lands | | EA in Progress | | | David Brock | | | | DOI-BLM-AZ-C010-2010-0016-EA | Kind of livestock change on the Diamond Bar | PD Lands | | EA in Progress | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0017-EA | Land Donation | Private Lands | | EA in Progress | | | Rebecca Peck | | | | DOI-BLM-AZ-C010-2010-0018-EA | R&PP Lease and Possible Conveyance | PD Lands | | EA Complete | | | Andy Whitefield | RPP Lease and Possible Conveyance | | | DOI-BLM-AZ-C010-2010-0019-EA | Three Rivers Complex Wild Burro Population Estimate and gather | PD Lands | 2/2/2010 | EA in progress | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0020-DNA | La Cienega Allotment Ephemeral Grazing Application | PD Lands | | DNA signed | | | Mike Blanton | | | | DOI-BLM-AZ-C010-2010-0021-DNA | WH&B Old Corral Decommissioning Addendum | State Lands | | Decision and DNA 2/22/10 | | 2/22/2010 | Rebecca Peck | | | | DOI-BLM-AZ-C010-2010-0022-DNA | Special Recreation Permit for SNORE Jeep Poker Run | PD Lands | | DNA in progress | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0023-CX | Grazing Transfer on Middle Water allotment | PD Lands | | cancelled | | | David Brock | | | | DOI-BLM-AZ-C010-2010-0024-CX | Grazing Transfer on Valentine allotment | PD Lands | | CX Complete | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0025-CX | Grazing Transfer on Stockton Hill allotment | PD Lands | | CX Complete | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0026-EA | Kind of livestock change on the Pine Springs Allotment | PD Lands | | EA in Progress | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0027-EA | Steele Park 69 kV Powerline, AZA 35334 | PD Lands | 4/1/2010 | EA in Progress | | | Joyce Cook | | | | DOI-BLM-AZ-C010-2010-0028-CX | Ponderosa Pine genetics study in Hualapai Mountains. | PD LAnds | 4/7/2010 | CX in progress | | | Ammon Wilhelm | | | | DOI-BLM-AZ-C010-2010-0029-CX | Research: Crissal Thrasher -Arizona State University | PD Lands | 4/19/2010 | CX in progress | | | Rebecca Peck | | | | DOI-BLM-AZ-C010-2010-0030-EA | Right-of-way for access to Golden Valley School (AZA 35054) and amendment to school R&PP lease (AZA 24229 01) | PD Lands | 4/29/2010 | EA Complete | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0031-EA | Right-of-way for electric line (AZA 35379) | PD Lands | 4/29/2010 | EA Complete | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0032-EA | Grand Canyon Ranch Trail Rides | PD Lands | 5/3/2010 | EA in Progress | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0033-DNA | TRAC-ON | PD Lands | 5/3/2010 | DNA in Progress | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0034-EA | MuleyBull Outfitters, LLC | PD Lands | 5/3/2010 | EA Complete | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0035-EA | Document Cancelled | PD Lands | | | | | | | | | DOI-BLM-AZ-C010-2010-0036-EA | Black Mountian Wild Burro Herd Management Area Gather | PD Lands | 5/10/2010 | EA in Progress | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0037-EA | Myth and Distaff Mine Closures | PD Lands | 5/12/2010 | CX in progress | | | Rebecca Peck | | | | DOI-BLM-AZ-C010-2010-0038-DNA | Oil and Gas Leases | PD Lands | 5/21/2010 | DNA in Progress | | | Paul Misiaszek | | | | DOI-BLM-AZ-C010-2010-0039-CX | Big Sandy Private Land Nuisance Wild Burro Removal | Private Lands | 6/21/2010 | CX Complete | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0040-CX | Pacific Wind Dolan Springs Testing and Project Area Application | PD Lands | 6/21/2010 | CX in Progress | | | Joyce Cook | | | | DOI-BLM-AZ-C010-2010-0041-CX | Grazing Transfer on Stockton Hill allotment | PD Lands | 6/29/2010 | CX Complete | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0042-CX | Canyon Contracting Services' hazmat removal and clean-up | PD Lands | 6/30/2010 | CX in progress | | | Paul Misiaszek | | | | DOI-BLM-AZ-C010-2010-0043-CX | Rights-of-way for County Flood Monitoring Devices | PD Lands | 7/2/2010 | CX in progress | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0044-CX | Rincon Tank - Wildlife Catchment | PD Lands | 7/6/2010 | EA in Progress | | | Rebecca Peck | | | | DOI-BLM-AZ-C010-2010-0045-EA | Byner Allotment Complex Permit Renewal and Associated Range Improvements | PD Land | 4/19/2010 | EA Complete | | | Mike Blanton | | | | DOI-BLM-AZ-C010-2010-0046-EA | Valentine Collins Well Pipeline Range Improvement | PD Land | 7/6/2010 | EA Complete | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0047-CX | Outside Alamo Herd Mangement Area Nuisance Wild Burro Removal | PD Lands | 7/8/2010 | CX Complete | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0048-CX | Katherine’s Landing and Oatman Nuisance Wild Burro Removal | Private Lands | 7/15/2010 | CX Complete | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0049-CX | Renewal of existing communication site ROW AZA 22683 on Hayden Peak | PD Lands | 7/16/2010 | CX Decision signed | | 7/28/2010 | Joyce Cook | | | | DOI-BLM-AZ-C010-2010-0050-CX | Removal of structure and materials of no historical value_"trash and debris" | PD Lands | 6/29/2010 | CX Decision signed | | 7/20/2010 | Jackie Neckels | | | | DOI-BLM-AZ-C010-2010-0051-EA | Right-of-way for substation and 69kV line | PD Lands | 7/22/2010 | EA in Progress | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0052-CX | Amendment of r-o-w AZA 19986 to relocate buried phone cables w/in SR 93 r-o-w | PD Lands | 7/28/2010 | CX Decision signed | | 8/4/2010 | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0053-DNA | Reclaim vehicle ways at Mount Nutt Wilderness | PD Lands | 7/28/2010 | DNA in Progress | | | Len Marceau | | | | DOI-BLM-AZ-C010-2010-0054-CX | 12 kV Powerline ROW, AZA 35455, to serve WH&B corrals | PD Lands | 8/5/2010 | CX Complete | | | Joyce Cook | | | | DOI-BLM-AZ-C010-2010-0055-CX | Grazing Transfer on Gediondia allotment | PD Lands | 8/13/2010 | CX Complete | | | Abe Clark | | | | DOI-BLM-AZ-C010-2010-0056-CX | La Puerta Road, Bullhead City, off Highway 68 Nuisance Wild Burro Removal | Private and PD Lands | 8/16/2010 | CX Complete | | | June Wendlandt | | | | DOI-BLM-AZ-C010-2010-0057-CX | Grazing Transfer on Walapai Ranch | PD lands | 8/17/2010 | CX in progress | | | David Brock | | | | DOI-BLM-AZ-C010-2010-0058-CX | Mud Springs Spring Protection | PD lands | 8/18/2010 | CX completed | | | David Brock | | | | DOI-BLM-AZ-C010-2010-0059-CX | U.Music Mtn. Post and Stay Permit | PD lands | 8/19/2010 | CX Complete | | | David Brock | | | | DOI-BLM-AZ-C010-2010-0060-DNA | Melody Exclosure Study Area Re-seed | PD lands | 8/18/2010 | DNA Complete | | | Ammon Wilhelm | | | | DOI-BLM-AZ-C010-2010-0061-EA | Palmerita Ranch Stabilization Project | PD Lands | 8/26/2010 | EA in Progress | | | Tim Watkins | | | | DOI-BLM-AZ-C010-2010-0062-EA | Bighorn Capture and Monitoring | PD Lands | 8/29/2010 | DNA in Progress | | | Rebecca Peck | | | | DOI-BLM-AZ-C010-2010-0063-CX | Parital assignment of ROW | PD Lands | 9/7/2010 | CX in progress | | | Andy Whitefield | | | | DOI-BLM-AZ-C010-2010-0064-CX | Temp ROWs for the BP project. | PD Lands | 9/7/2010 | CX in progress | | | Melissa Warren | | |
 |
Yuma Field Office · 2555 East Gila Ridge Road · Yuma, AZ 85365 · (928) 317-3200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | | DOI-BLM-AZ-C020-2010-0001-CX | El Paso Natural Gas CPS | Public Domain | | in progress | | | A. Lopez | | | DOI-BLM-AZ-C020-2010-0002-CX | Burro Trap Bard | Private | | Cancelled | | | J. Hall | | | DOI-BLM-AZ-C020-2010-0003-CX | Verizon Wireless Cunningham | Public Domain | | in progress | | | A. Lopez | | | DOI-BLM-AZ-C020-2010-0004-EA | Imperial Dam Recreation Area ARRA Project | Public Domain | | complete | | 10/16/2009 | R. Morfin | | | DOI-BLM-AZ-C020-2010-0005-CX | La Posa ARRA Project | Public Domain | | in progress | | | R. Morfin | | | DOI-BLM-AZ-C020-2010-0006-DNA | Oxbow ARRA Project | Public Domain | | in progress | | | R. Morfin | | | DOI-BLM-AZ-C020-2010-0007-CX | Quartzsite Dump | Public Domain | | in progress | | | A. Lopez | | | DOI-BLM-AZ-C020-2010-0008-CX | TDS Telecon Communication Line ROW | Public Domain | | in progress | | | V. Briceno | | | DOI-BLM-AZ-C020-2010-0009-CX | ADOT 16th StreetAccess Road ROW | Public Domain | | in progress | | | V. Briceno | | | DOI-BLM-AZ-C020-2010-0010-CX | Ag. Lease Renewal | Public Domain | | in progress | | | C. Holzer | | | DOI-BLM-AZ-C020-2010-0011-EA | Ranegras Oil and Gas Lease Sale | Public Domain | | in progress | | | B. Todd | | | DOI-BLM-AZ-C020-2010-0012-EA | Burro Reduction Cibola-Trigo HMA | Public Domain | | Completed | | EA, DR, FONSI 7/13/2010 | J. Hall | | | DOI-BLM-AZ-C020-2010-0013-EA | City of Yuma 30-inch underground water pipeline | Public Domain | | in progress | | | A. Lopez | | | DOI-BLM-AZ-C020-2010-0014-CX | Quartzsite Mine Shaft Closure | Public Domain | | in progress | | | C. Persson | | | DOI-BLM-AZ-C020-2010-0015-EA | Proposed Reopening of the Copperstone Mine | Public Domain | | EA, DR, FONSI & MPO | Complete | | C. Persson | |
 |
Lake Havasu Field Office · 2610 Sweetwater Avenue · Lake Havasu City, AZ 86406 · (928) 505-1200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-C030-2010-0001-EA | Lake Vending in Thompson Bay Area SRPs | Lake Havasu/Thompson Bay - T.13N. R20W. Sec. 15/22/23 | Dec-09 | EA complete
DR issued 04/2010 | 3/2/10 - 4/2/10 | 4/20/2010 | M. Henderson | NOA & EA DR | | | DOI-BLM-AZ-C030-2010-0002-EA | Silver Creek Wind Project, AZ34965 | Bullhead City area - T. 19N., R. 21W, Sec 28 | | EA in progress | | | G. Trafton | | | | DOI-BLM-AZ-C030-2010-0003-EA | Dead Mountains Wilderness Inholding Donations, CACA050605,CACA050607,CACA05606 | North West of Needles - 3 parcles in T. 10N. R. 22E Sec 16 | | EA in progress | 12/15/2010-01/15/2011 | | P. Fuselier | DOI-BLM-AZ-C030-2010-0003-EA | | | DOI-BLM-AZ-C030-2010-0004-DNA | Blythe Riding Club, 2932 | Mineral Wash - T. 10N., R. 17W., Sec 22 | | DNA pending | | 11/3/2009 | M. McCoy | | | | DOI-BLM-AZ-C030-2010-0005-EA | McMullen Valley Chamber Commerce, 2932 | Salome/Centennial Park - T. 12N., R. 12W., sec | | EA complete | | 2/18/2010 | M. McCoy | | | | DOI-BLM-AZ-C030-2010-0006-EA | "Mad" Mike Hughes Rocket Jump | Site Six | Cancelled | Cancelled | | Cancelled | E. Thoele | | | | DOI-BLM-AZ-C030-2010-0007- | Black Meadow Bandito Bros Film Permit | Black Meadow Concession | | Not Presented | | | P. Taylor | | | | DOI-BLM-AZ-C030-2010-0008-EA | Mark Wellenstein - Vending | Thompson Bay - T.13N. R20W. Sec. 22 | | EA cancelled. Incorporated into DOI-BLM-AZ-C030-2010-0001 | | EA cancelled. Incorporated into DOI-BLM-AZ-C030-2010-0001 | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0009-EA | JML Watercraft Rentals | Thompson Bay - T.13N. R20W. Sec. 22 | | EA in progress | | | M. Henderson | | | | DOI-BLM-AZ-C030-2010-0010-EA | St. Patrick's Day Poker Run, 2932 | Routes in La Paz County - T.9 N. R19 W. Sec 1 | | EA in progress | | | M. McCoy | | | | DOI-BLM-AZ-C030-2010-0011-DNA | London Bridge Regatta, 2932 | North Lake Havasu - T.13 N. R. 20 W. Secs 8/9 | | DNA completed | | 1/11/2010 | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0012-CX | Canadian Mining Bullard Pass Project, AZA35234 | Bullard Peak (N. of Aguila) - T8N,R10W, sec. 2 | | CX completed | | 12/21/2009 | A. Dodson | | | | DOI-BLM-AZ-C030-2010-0013-CX | Partners Point Waterline | Partner's Point (LHC) - T13N. R20W. Sec 25 NW1/4 | | DNA in progress | | | B. Parry | | | | DOI-BLM-AZ-C030-2010-0014-DNA | Parker Soroptomists Poker Run, 2932 | Shea Rd Osborne Ws - T.9 N. R19 W. Sec 1 | cancelled | | | Cancelled | M. McCoy | | | | DOI-BLM-AZ-C030-2010-0015-CX | Havasu 4 Wheeler Desert Cleanup | Paseo del Oro | 2/25/2010 | CX in progress | | | M.McCoy | | | | DOI-BLM-AZ-C030-2010-0016-CX | Monkeyhead bench installation | Monkeyhead - T.11N R18W sec 28 | | CX in progress | | | E. Thoele | | | | DOI-BLM-AZ-C030-2010-0017-EA | Phillips Excavating Mineral Material Contract, CACA 50793 | Needles, CA - T9N, R22E, sec. 24 | | EA in progress | | | A. Dodson | | | | DOI-BLM-AZ-C030-2010-0019-CX | Bullhead City Kiosk Program | Bullhead City area - T. 19N., R. 22W, Sec 2 | 7/6/2009 | CX completed | | 4/15/2010 | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0020-CX | ROW CACA 42545 Assignment | Fort Mojave - T11N, R21E, sec. 14 | | CX in progress | | | Mrosalez | | | | DOI-BLM-AZ-C030-2010-0021-EA | CRNC Vegetation Maint. | CRNC, Bullhead City | | EA in progress | | | E. Thoele | | | | DOI-BLM-AZ-C030-2010-0022-CX | City of Needles Public Utility Easement, CACA 51602 | Notcho Road, Needles | | CX pending | | | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0023-CX | US Defense Natl Stockpile Center, AZA 11515 | Wenden area | 2/4/2010 | CX completed | | 3/8/2010 | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0024-EA | APS - Black Peak to Salome | Southern Field Office | | EA in progress | | | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0025-EA | City of Needles Powerline ROW, ACA 51547 | Needles, CA | | EA pending | | | M. Rosalez | | | | DOI-BLM-AZ-C030-2010-0026-EA | Rockhouse Lease/ROW | Rockhouse, CA | | EA pending | | | P. Taylor | | | | DOI-BLM-AZ-C030-2010-0027-CX | Jupiter Mine & Pittsburg Mine Fencing Project | Southern Mohave Mountains | | CX in progress | n/a | 3/26/2010 | A. Dodson | | | | DOI-BLM-AZ-C030-2010-0028-EA | Sunchaser Challenge (SARA Park), 2932 | Shoreline/SARA Park | | not presented | | | M. McCoy | | | | DOI-BLM-AZ-C030-2010-0029-CX | Nevada Power Co. Assignment, CALA 53472 | Needles, CA | | CX in progress | | | Mr. Rosalez | | | | DOI-BLM-AZ-C030-2010-0030-CX | Big Sandy NRCD, AZA 30675 | Ft. Mohave, AZ | | CX in progress | | | Mrosalez | | | | DOI-BLM-AZ-C030-2010-0031-CX | GB & GD, LLC ROW Assignment, AZA 31901 | Alamo Dam area | | CX completed | | 7/16/2010 | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0032-EA | Pima Wash Dredging | SW ¼ of Sec 15, T. 13 N, R. 20 W | November 2009 | EA in progress | | | D. Adams | | | | DOI-BLM-AZ-C030-2010-0033-CX | Assignment of ROW AZA 23167 to Sun West land & Investment,Ltd | North of Salome T4N,R12W Sec. 9 | 3/11/2010 | CX in progress | | | | | | | DOI-BLM-AZ-C030-2010-0034-CX | Meteorological Monitoring by NWS | T. 9N. R 10W. Sec 5, E2E2E2 | 3/31/2010 | CX in progress | | | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0035-EA | Parker 400 course Midway Pit Expansion | T. 8N. R 16W., sec 1 | 3/1/2010 | | | | M. McCoy | | | | DOI-BLM-AZ-C030-2010-0036-EA | Lake Havasu Boating Events | All of Lake Havasu | 4/28/2010 | Prog. EA in progress | | | M. Henderson | | | | DOI-BLM-AZ-C030-2010-0037-CX | Chesney Agriculture Renewal | T. 17 N., R. 21 W., sec. 19 lots 1 & 2 | 6/3/2010 | CX in progress | | | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0038-CX | Chesney Road ROW Renewal | T. 17 N., R. 21 W., sec. 19 lots 1 & 2 | 6/3/2010 | CX completed | | 6/18/2010 | S. Ahrens | | | | DOI-BLM-AZ-C030-2010-0039-CX | Jerry Triplett Mineral Material Contract, AZA 35410 | Brenda T4N, R16W, sec. 17 | 6/14/2010 | CX in progress | | | A. Dodson | | | | DOI-BLM-AZ_C030-2010-0040-CX | Mohave Cnty Flood Control-weather stations | T. 14 N., R. 19 W., Sec 13 & 26 | 6/17/2010 | CX in progress | | | S. Ahrens | | | | DOI-BLM-AZ_C030-2010-0041-CX | NBC Universal Filming-Standard Wash | T. 13 N., R. 19 W., Sec 26 & 33 T. 12 N., R. 18 W., Sec 8 | 6/8/2010 | CX in progress | | 7/20/2010 | S. Ahrens | | | | DOI-BLM-AZ_C030-2010-0042-DNA | Todd Taylor - Joker's Wild - Still Photography on Lake | Lake Havasu | 7/12/2010 | DNA Completed | | 7/16/2010 | S. Ahrens |
 |
Gila District Office · 1763 Paseo San Luis · Sierra Vista, AZ 85635 · (520) 439-6400
 |
Safford Field Office · 711 14th Avenue · Safford, AZ 85546 · (928) 348-4400 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-G010-2010-0001-CX | Sanchez CCC Vehicle Barrier | PD Land | 11/15/2009 | CX completed | | 11/23/2009 | Dan McGrew | | | | DOI-BLM-AZ-G010-2010-0002-CX | Recovery - Wildlife Exclosure Fences | PD Land | 10/8/2009 | CX completed | | 10/14/2009 | Heidi Blasius/Tim Goodman | | | | DOI-BLM-AZ-G010-2010-0003-EA | Whitlock Peak Prescribed Fire | PD Land | 10/12/2009 | EA in progress | | | RJ Estes/Dan Quintana | | | | DOI-BLM-AZ-G010-2010-0004-EA | Recovery – San Simon Channel Fence | PD Land | 11/4/2009 | EA completed | | 1/7/2010 | Amy Humphrey | | | | DOI-BLM-AZ-G010-2010-0005-EA | Southwest Transmission | PD Land | 10/15/2009 | PUP (Direx) completed | | 12/7/2009 | Dave Arthun | | | | DOI-BLM-AZ-G010-2010-0006-EA | Southwest Transmission | PD Land | 10/15/2009 | PUP (Roundup Pro) completed | | 12/7/2009 | Dave Arthun | | | | DOI-BLM-AZ-G010-2010-0007-EA | Southwest Transmission | PD Land | | PUP (Polaris RR) cancelled | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2010-0008-EA | Southwest Transmission | PD Land | 10/15/2009 | PUP (Bromacil) completed | | 12/7/2009 | Dave Arthun | | | | DOI-BLM-AZ-G010-2010-0009-CX | Lost Tank Canyon (#06064) Allotment Transfer | PD Land | | CX withdrawn | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2010-0010-CX | Small/Murchison Transfer | PD Land | | CX withdrawn | | | Amy Humphrey | | | | DOI-BLM-AZ-G010-2010-0011-CX | Aravaipa Emergency CX | PD Land | 9/15/2009 | CX completed | | 10/6/2009 | Amy Humphrey | | | | DOI-BLM-AZ-G010-2010-0012-CX | Day Mine Allotment Transfer #04604 | PD Land | 12/16/2009 | CX completed | | 5/20/2010 | RJ Estes | | | | DOI-BLM-AZ-G010-2010-0013-EA | MidWest Mining’s Plan of Operations for Gold Mining | PD Land | 12/17/2008 | EA completed | | 4/5/2010 | Larry Thrasher | | | | DOI-BLM-AZ-G010-2010-0014-EA | Turkey Creek Erosion Control | PD Land | 1/4/2010 | EA completed | | 3/30/2010 | Jeff Conn | | | | DOI-BLM-AZ-G010-2010-0015-CX | Tollgate Solar Panel | PD Land | 11/8/2010 | CX in progress | | | Dave Arthun | | | | DOI-BLM-AZ-G010-2010-0016-PUP | Recovery-Creosote Treatment | PD Land | | PUP cancelled | | | Jeff Conn | | | | DOI-BLM-AZ-GO1O-2010-0017-PUP | Recovery-Acacia Treatment | PD Land | | PUP cancelled | | | Jeff Conn | | | | DOI-BLM-AZ-GOIO-2010-0018-PUP | Recovery-Mesquite Treatment | PD Land | | PUP cancelled | | | Jeff Conn | | | | DOI-BLM-AZ-GO1O-2010-0019-EA | Porter Wash Pond Fencing Project: Habitat Improvement and Protection | PD Land | 11/9/2009 | EA in progress | | | Heidi Blasius | | | | DOI-BLM-AZ-GO1O-2010-0020-CX | Black Rock Allotment Transfer | PD Land | 1/25/2010 | CX completed | | 2/8/2010 | Gwen Dominquez | | | | DOI-BLM-AZ-GO1O-2010-0021-CX | Emery Allotment Transfer | PD Land | 8/17/2009 | CX completed | | 2/16/2010 | Gwen Dominquez | | | | DOI-BLM-AZ-GO1O-2010-0022-EA | Turkey and Parson's Prescribed Burn(s) | PD Land | 6/28/2010 | EA in progress | | | Jeff Conn | | | | DOI-BLM-AZ-GO1O-2010-0023-EA | Rockhouse Prescribed Burn | PD Land | 2/8/2010 | EA in progress | | | Mark Pater | | | | DOI-BLM-AZ-GO1O-2010-0024-DNA | UOP Mining Plan Amendment | PD Land | 3/7/2010 | DNA completed | | 4/21/2010 | Larry Thrasher | | | | DOI-BLM-AZ-GO1O-2010-0025-EA | Safford Pile Burns | PD Land | 11/1/2010 | EA completed | | 2/14/2011 | Jon Ziegler | | | | DOI-BLM-AZ-GO1O-2010-0026-EA | Peebles Navajo Cactus Exclosure Section 14 | PD Land | 3/8/2010 | EA completed | | 7/13/2010 | Jony Cockman | | | | DOI-BLM-AZ-GO1O-2010-0027-EA | Sands Draw Aquatic Enhancement and Improvement for Native Fish | PD Land | 5/1/2010 | EA in progress | | | Hiedi Blasius | | | | DOI-BLM-AZ-GO1O-2010-0028-EA | Joy Valley Well Water Improvements | PD Land | 5/15/2010 | EA in progress | | | Amy Humphrey | | | | DOI-BLM-AZ-GO1O-2010-0029-EA | Buck Canyon Water Improvement | PD Land | | EA withdrawn | | | Amy Humphrey | | | | DOI-BLM-AZ-GO1O-2010-0030-DNA | Sand and Gravel Free Use Permit at Whitetail Wash for Cochise County | PD Land | 7/6/2010 | DNA completed | | 10/5/2010 | Larry Thrasher | | | | DOI-BLM-AZ-GO1O-2010-0031-DNA | Sugarloaf Substation Road | PD Land | 5/22/2010 | DNA completed | | 5/28/2010 | Roberta Lopez | | | | DOI-BLM-AZ-GO1O-2010-0032-EA | Pinal County Department of Public Works Alert Repeater and Stream/Rain Gauge | PD Land | 6/3/2010 | EA in progress | | | Joan Galanis | | | | DOI-BLM-AZ-GO1O-2010-0033-CX | Conveyance of Mineral Interest to Benson 5200 LLC | PD Land | 6/1/2010 | CX completed | | 7/1/2010 | Larry Thrasher | | | | DOI-BLM-AZ-GO1O-2010-0034-EA | AGFD Camel's Back Wildlife Catchment | PD Land | 11/10/2010 | EA in progress | | | Tim Goodman | | | | DOI-BLM-AZ-GO1O-2010-0035-EA | AGFD Whitlock Hills Numbers 1 and 2 Wildlife Catchments | PD Land | 8/2/2010 | EA in progress | | | Tim Goodman | | | | DOI-BLM-AZ-GO1O-2010-0036-EA | AGFD Government Peak Slick Rock Wildlife Catchment | PD Land | 7/19/2010 | EA in progress | | | Tim Goodman | | | | DOI-BLM-AZ-GO1O-2010-0037-DNA | New 10-Year Free-Use Permit to BLM Safford FO for 8 Sand and gravel Sites | PD Land | 8/9/2010 | DNA completed | | 9/14/2010 | Larry Thrasher | | | | DOI-BLM-AZ-GO1O-2010-0038-DNA | Town of Snowflake Road ROW | PD Land | 7/13/2010 | DNA in progress | | | Joan Galanis | | | | DOI-BLM-AZ-GO1O-2010-0039-DNA | Oil and Gas Leases South of Dos Cabezas | PD Land | 8/5/2010 | DNA completed | | 8/27/2010 | Larry Thrasher | | | | DOI-BLM-AZ-GO1O-2010-0040-EA | Mining Limestone From the Chambers Quarry N. of Douglas | PD Land | 7/14/2010 | Eacompleted | | 2/7/2011 | Larry Thrasher | | | | DOI-BLM-AZ-GO1O-2010-0041-CX | United States Border Patrol | PD Land | | CX cancelled | | | Roberta Lopez | | | | DOI-BLM-AZ-GO1O-2010-0042-CX | HYL Allotment Transfer #05144 | PD Land | 8/28/2010 | CX in progress | | | RJ Estes | | | | DOI-BLM-AZ-GO1O-2010-0043-DNA | Double H Outfitters | PD Land | 8/31/2010 | DNA completed | | 10/29/2010 | Deborah Morris | | | | DOI-BLM-AZ-GO1O-2010-0044-CX | Sand & Gravel Free Use Permit at Ball Road for Cochise County | PD Land | 9/22/2010 | CX completed | | 10/21/2010 | Larry Thrasher | | |
 |
Tucson Field Office · 12661 East Broadway · Tucson, AZ 85748 · (520) 258-7200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-G020-2010-0001-EA | Cox Communications Fiber Optic ROW | SPRNCA | 6/2/2008 | Complete | | 10/19/2009 | S. Bernal | EA-0001 (23M) | | | DOI-BLM-AZ-G020-2010-0002-DNA | Mineral Mountain Bighorn Sheep augmentation | Middle Gila | 10/23/2009 | Cancelled | | | D. Tersey | | | | DOI-BLM-AZ-G020-2010-0003-EA | ARRA - Little Boquillas Maintenance Shop Installation | SPRNCA | 11/9/2009 | Complete | | 11/30/2009 | R. Peru | | | | DOI-BLM-AZ-G020-2010-0004-EA | ARRA - Empire Ranch Solar Installation | LCNCA | 11/9/2009 | Complete | | 11/30/2009 | R. Peru | | | | DOI-BLM-AZ-G020-2010-0005-CX | APS - 12kV line to Mule Mtn Renewal AZA-32455 | Bisbee - PD lands | 11/12/2009 | Pending | | | L. Dunlavey | | | | DOI-BLM-AZ-G020-2010-0006-CX | Cochise Co. CARA Communication ROW | Sierra Vista - PD Lands | 11/17/2009 | Complete | | 12/7/2009 | S. Bernal | | | | DOI-BLM-AZ-G020-2010-0007-CX | Special Recreation Permit Boice, JFaith | LCNCA | 11/16/2009 | Complete | | 12/21/2009 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0008-CX | 14.4/24/9 kV Distribution Line Right-of-way Renewal | TFO | 12/7/2009 | Complete | | 1/28/2010 | S. Loomis | | | | DOI-BLM-AZ-G020-2010-0009-DNA | Special Recreation Permit Sheriff Posse | LCNCA | 12/7/2009 | Complete | | 12/21/2009 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0010-CX | Special Recreation Permit renewals Bird Dog events | LCNCA | 12/11/2009 | Complete | | 2/9/2010 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0011-EA | Empire Allotment Range Improvement Projects | LCNCA | 12/14/2009 | Pending | | | K. Duarte | | | | DOI-BLM-AZ-G020-2010-0012-CX | El Paso AZA-22090 Amendment | SPRNCA | 12/30/2009 | Complete | | 3/17/2010 | L. Dunlavey | | | | DOI-BLM-AZ-G020-2010-0013-CX | SPRNCA Beaver Relocation (PROJECT CANCELLED) | SPRNCA | 1/11/2010 | Cancelled | | | M. Radke | | | | DOI-BLM-AZ-G020-2010-0014-DNA | Special Recreation Permit Renewal Mike Bridges Clinics | LCNCA | 1/13/2010 | Complete | | 2/1/2010 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0015-DNA | Saguaro National Park Service Herbicide Research Project | TFO lands | 1/20/2010 | Complete | | 4/30/2010 | D. Tersey | | | | DOI-BLM-AZ-G020-2010-0016-CX | SPRNCA Burrow Owl Box Implementation | SPRNCA | 1/11/2010 | Complete | | 3/25/2010 | M. Radke | | | | DOI-BLM-AZ-G020-2010-0017-CX | Moson Road Fencing Project | Sierra Vista - PD Lands | 1/25/2010 | Complete | | 6/16/2010 | S. Bernal | | | | DOI-BLM-AZ-G020-2010-0018-CX | One Production Services Filming Permit | LCNCA | 2/1/2010 | Complete | | 2/9/2010 | L. Dunlavey | | | | DOI-BLM-AZ-G020-2010-0019-CX | Northeast Cienega Fence Reconstruction | SPRNCA | 2/9/2010 | Pending | | | H. Swanson | | | | DOI-BLM-AZ-G020-2010-0020-EA | ARRA - Box Canyon Adit Closure | Middle Gila | 2/1/2010 | Complete | | 2/25/2010 | D. Moore | | | | DOI-BLM-AZ-G020-2010-0021EA | Dudleyville Road Project | Middle Gila | 2/23/2010 | Pending | | | S. Bernal | | | | DOI-BLM-AZ-G020-2010-0022-CX | Horse Endurance Ride SRP renewals | LCNCA | 1/28/2010 | Complete | | 3/15/2010 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0023-EA | Sulpher Springs Electric Corporation AZA-35067 14.4 kV powerline | TFO- Tombstone | 3/2/2010 | Pending | | | L. Dunlavey | | | | DOI-BLM-AZ-G020-2010-0024-DNA | Empire Ranch Trail Ride AZA 35328 | LCNCA | 2/8/2010 | Complete | | 3/31/2010 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0025-CX | SPRNCA Abandoned Fence Removal (Palominas) | SPRNCA | 3/22/2010 | Complete | | 4/26/2010 | M. Radke | | | | DOI-BLM-AZ-G020-2010-0026-DNA | Iron Door Mine Abandoned Mine Remediation | TFO | 4/22/2010 | Complete | | 7/29/2010 | K.Hughes | | | | DOI-BLM-AZ-G020-2010-0027-DNA | Tucson Saddle Club Tierra Bella SRP A28262 | LCNCA | 3/20/2010 | Complete | | 6/21/2010 | C. Fenn | | | | DOI-BLM-AZ-G020-2010-0028-CX | Avra Valley Coop., Inc. ROW Renewal | TFO | 5/192010 | Complete | | 6/15/2010 | S.Loomis | | | | DOI-BLM-AZ-G020-2010-0029-EA | Tucson Electric Power AZA-35314 Existing line Camino Verde | TFO | 5/21/2010 | Complete | | 8/10/2010 | L. Dunlavey | EA-0029 | | | DOI-BLM-AZ-G020-2010-0030-DNA | Arizona National Scenic Trail- White Canyon Passage Trail Development | In a National Trail Corridor- Arizona National Scenic Trail | 6/1/2010 | Complete | | 8/30/2010 | F. Mendoza | | | | DOI-BLM-AZ-G020-2010-0031-CX | ROW Appln for Diamond Bell Road (AZA35169) filed by Pima County | TFO | 6/4/2010 | Complete | | 7/24/2010 | S. Loomis | | | | DOI-BLM-AZ-G020-2010-0032-CX | ROW Appln for Camino Verde Road (AZA 35322) filed by Pima County | TFO | 6/17/2010 | Complete | | 7/24/2010 | S.Loomis | | | | DOI-BLM-AZ-G020-2010-0033-EA | Trico Electric ROW AZA 33726 Amendment | TFO | | Pending | | | S.Loomis | | | | DOI-BLM-A-G020-2010-0034-CX | Brunckow Mine Shaft Fencing Project | SPRCA | 7/9/2010 | Complete | | 7/29/2010 | K. Hughes | | | | DOI-BLM-AG020-2010-034-CX | Renew Existing 7.2 kV power distribution lines for Sulphur Springs AZA 20288 | TFO | 7/12/2010 | Complete | | 8/27/2010 | S.Loomis | | | | DOI-BLM-AG020-2010-035-CX | Renew Existing 7.2 kV power distribution lines for Sulphur Springs AZA 23604 | SPRNCA | 7/12/2010 | Complete | | 8/10/2010 | S.Loomis | | | | DOI-BLM-AG020-2010-036-CX | Renew Existing 14 kV Electric Distribution Line for TEPCO AZA 10840 | TFO | 7/16/2010 | Complete | | 10/25/2010 | S.Loomis | | | | DOI-BLM-AG020-2010-037-CX | Renew Existing Communication Site Right-of-way for Verizon Wireless on Mule Mtn./Juniper Flats | TFO | 8/5/2010 | Complete | | 10/15/2010 | S.Loomis | | | | DOI-BLM-AG020-2010-038-EA | R&PP Lease Application for an Extension to Casa Grande Mountain Park AZA-33431 | TFO | 8/6/2010 | Complete | | 10/4/2010 | L. Dunlavey | EA-0038 | | | DOI-BLM-AZ020-2010-039 -CX | ROW Application for existing historic Sasco Road | IFNM | 8/13/2010 | Pending | | | S. Loomis | | | | DOI-BLM-AZ020-2010-040-CX | Renew Existing ROW for telephone service to Davis Monthan Air Force Base | TFO | 8/23/2010 | Complete | | 10/13/2010 | S.Loomis | | | | DOI-BLM-AZ020-2010-041-CX | Renew Existing ROW for the Globe-Hayden Telephone Line | TFO | 8/23/2010 | Complete | | 10/13/2010 | S.Loomis | | | | DOI-BLM-AZ-G020-2010-0042-CX | Battle Axe Road Maintenance | TFO | 9/2/2010 | Pending | | | F. Mendoza | | | | DOI-BLM-AZ-G020-2010-0043-CX | Renew Existing ROW for Trico Electric Coop. AZA 35491 | Ironwood N.M. | 9/14/2010 | Complete | | 10/13/2010 | S.Loomis | | | | DOI-BLM-AZ-G020-2010-0044-DNA | Mineral Mountain Bighorn Sheep augmentation | Middle Gila | 9/20/2010 | Pending | | | D. Tersey | | |
 |
Ironwood Forest National Monument * 12661 East Broadway * Tucson, AZ 85748 * Phone Number (520) 258-7200 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-G030-2010-0001-CX | Waterman Airstrip Reclamation | Federal lands administered by the BLM in the Ironwood Forest National Monument | 5/14/2010 | CX in progress | | 5/19/2010 | Francisco Mendoza (520)258-7226 | | | | DOI-BLM-AZ-G030-2010-0002-CX | IFNM Road Maintenance 2010 | Federal lands administered by the BLM in the Ironwood Forest National Monument | 6/10/2010 | CX in progress | | | Francisco Mendoza (520)258-7226 | | | | DOI-BLM-AZ-G030-2010-0003-CX | IFNM Cattleguard 2010 | Federal lands administered by the BLM in the Ironwood Forest National Monument | 6/11/2010 | CX in progress | | | Darrell Tersey (520)258-7218 | | | | DOI-BLM-AZ-G030-2010-0004-CX | Spray Ball testing | Federal lands administered by the BLM in the Ironwood Forest National Monument | 7/9/2010 | CX in progress | | | Darrell Tersey (520)258-7218 | | | | DOI-BLM-AZ-G030-2010-0005-CX | Waterman’s vegetation reclamation | Federal lands administered by the BLM in the Ironwood Forest National Monument | 7/9/2010 | CX in progress | | | Darrell Tersey (520)258-7218 | | |
 |
Phoenix District Office · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500
 |
Hassayampa Field Office · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P010-2010-001-CX | Lake Pleasant HMA Nuisance Burro Removal | T6N, R2E, S18-19 (part) | 10/8/2009 | CX completed | | 10/8/2009 | B. Bishop | Please contact Leah Baker at 623.580.5656 to obtain a copy of this document | | | DOI-BLM-AZ-P010-2010-002-CX | Lake Pleasant HMA Nuisance Burro Removal | T6N, R2E, S18-19 (part) | 10/8/2009 | CX completed | | 10/8/2009 | B. Bishop | Please contact Leah Baker at 623.580.5656 to obtain a copy of this document | | | DOI-BLM-AZ-P010-2010-003-CX | Arizona Natural Gold E&R Mineral Materials Exploration Permit Application | T7 N, R2E, S5 (part), T8N, R2E, S32 (part) | 10/16/2009 | CX Completed | | 10/16/2009 | Dave Eddy | DOI-BLM-AZ-P010-2010-003-CX | | | DOI-BLM-AZ-P010-2010-004-CX | Black Canyon City Riders Speical Recreation Permit | Black Canyon City area | | CX In Progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2010-005-CX | Arizona Outdoor Fun Rentals Special Recreation Permit | Table Mesa area | 12/6/2009 | CX Completed | | 10/5/2010 | Mary Skordinsky | DOI-BLM-AZ-P010-2010-005-CX | | | DOI-BLM-AZ-P010-2010-006-DNA | 4-Wheeling America Special Recreation Permit | Boulders/Hieroglyphic numbered trails | 12/2/2009 | DNA In Progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2010-007-CX | Gold Prospectors Association of Phoenix Special Recreation Permit | Various mining sites | 1/15/2009 | CX completed | | 12/15/2009 | Mary Skordinsky | Please contact Leah Baker at 623.580.5656 to obtain a copy of this document | | | DOI-BLM-AZ-P010-2010-008-EA | Accipiter/Zona Fiberoptic R/W | SR74 & Hassayampa Plain | 1/20/2010 | EA Completed | | 3/18/2010 | Jim Andersen | DOI-BLM-AZ-P010-2010-008-EA | | | DOI-BLM-AZ-P010-2010-009-CX | GJG ACP II LLC, Road ROW | T8N, R2E, S27-28 | Feb-10 | CX completed | | 11/4/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-009-CX | | | DOI-BLM-AZ-P010-2010-010-CX | Heidi E Parnell Revocable Trust, Road ROW (Changed to Gillette Investments LLC) | T8N, R2E, S27-28 | Feb-10 | CX completed | | 11/4/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-010-CX | | | DOI-BLM-AZ-P010-2010-011-CX | Interim Flood and Erosion Control of BLM Airstrip, Gravel and Installing of Fence | T7N, R1W, Sec 13 | 2/9/2010 | CX completed | | 2/24/2010 | Mary Skordinsky | Please contact Leah Baker at 623.580.5656 to obtain a copy of this document | | | DOI-BLM-AZ-P010-2010-012-CX | Larry White, Apiary Renewal | T6N, R5W, S6; T6N, R8W, S5; T6N, R9W, S10; T8N, R9W, S7 | Mar-10 | CX completed | | 5/17/2010 | Hillary Connor | DOI-BLM-AZ-P010-2010-012-CX | | | DOI-BLM-AZ-P010-2010-013-CX | Larry White, Apiary Renewal | T6N, R1W, S14 and 26; T7 N, R1W, S13; T6N, R2W, S25; T7 N, R2W, S19; T7 N, R3W, S26 | Mar-10 | CX completed | | 5/17/2010 | Hillary Connor | DOI-BLM-AZ-P010-2010-013-CX | | | DOI-BLM-AZ-P010-2010-014-CX | Windwalker Expedictions Special Recreation Permit | Table Mesa, Black Canyon Trail, North Lake Pleasant Areas | Apr-10 | CX In Progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2010-015-CX | Maricopa County Flood Control ROW Renewal | | Apr-10 | CX completed | | 4/30/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-015-CX | | | DOI-BLM-AZ-P010-2010-016-EA | Buckeye White Tanks Regional Park | T. 2N., R. 3W, Various Sections | 4/27/2010 | EA/FONSI/DR | | 6/7/2010 | JoAnn Goodlow | 2009 02 Buckeye White Tanks Environmental Assessment - FULL DOC | | | DOI-BLM-AZ-P010-2010-017-EA | Maricopa County Flood Control,Right of Way Grant Ammendment | T6N, R5W, S6 SWNE | 5/3/2010 | EA/FONSI/DR | | 7/23/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-017-EA | | | DOI-BLM-AZ-P010-2010-018-CX | Miller Road AML -- Backfilling Abandoned Mine Land Features | T. 1 N., R. 4 W., S 1/2 of sections 11 & 12 | 5/4/2010 | CX completed | | 5/5/2010 | Matt Plis | DOI-BLM-AZ-P010-2010-018-CX | | | DOI-BLM-AZ-P010-2010-019-CX | Arizona Rough Riders Special Recreation Permit | Boulders OHV Staging area & trails T6N R2W Sec. 10, 14, 15, 22, 23, 26, 27 | 5/5/2010 | DNA In Progress | | | Mary Skordinsky | | | | DOI-BLM-AZ-P010-2010-020-CX | Durham Communication ROW Renewal | Gila & Salt River Meridian, Maricopa County, Arizona, T. 3 N., R. 3 W., sec 27, tract 37. | 6/1/2010 | CX completed | | 6/2/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-020-CX | | | DOI-BLM-AZ-P010-2010-021-CX | Big Spar Mine Site -- Backfill 9 hazardous abandoned mine features (3 open shafts, 1 open stope, and 5 prospect pits) at the Big Spar Mine Site | T6N, R5W, NE 1/4 of section 4 | | CX completed | | | Matt Plis | Please contact Leah Baker at 623.580.5656 to obtain a copy of this document | | | DOI-BLM-AZ-P010-2010-022-CX | Special Recreation Permit Renewal, Arizona Rough Riders 4x4 Halloween Spook Run | T.6N. R.2W. S.10, 14, 15, 22, 23, 26, 27 | 5/5/2010 | CX Completed | | 10/14/2010 | Mary Skordinsky | DOI-BLM-AZ-P010-2010-022-CX | | | DOI-BLM-AZ-P010-2010-023-CX | TS5 - TS1 230kV Transmision Line -- Future Transmision Substation sites Located south of CAP, near the Hassayampa Pump Station | T. 4N. R.4W. S. 20, 21, 22, Tract 39, T4.N., 3W, S17 | 7/9/2010 | CX In Progress | | | Kathy Depukat | | | | DOI-BLM-AZ-P010-2010-024-DNA | Mineral materials sale for 100,000 tons of material (crushed stone), Cemex Construction Materials | T. 7 N., R. 2 E., Sec. 3 (part) | 7/21/2010 | DNA Completed | | 10/29/2010 | Dave Eddy | DOI-BLM-AZ-P010-2010-024-DNA | | | DOI-BLM-AZ-P010-2010-025-CX | APS -- General Communications Radio Relay 12kV extension, ROW Renewal | T5N, R4E, Sec 4, Lot 10 | 7/21/2010 | CX completed | | 9/14/2010 | JoAnn Goodlow | DOI-BLM-AZ-P010-2010-025-CX | | | DOI-BLM-AZ-P010-2010-026-CX | APS -- United Metro Electric Line Relocation, ROW Renewal | T2N, R10W, Sec 1 | 7/21/2010 | CX completed | | 9/14/2010 | JoAnn Goodlow | DOI-BLM-AZ-P010-2010-026-CX | | | DOI-BLM-AZ-P010-2010-027-CX | Yavapai County Board of Supervisors, Road ROW Renewal | T11N, R2E, Sec 8, Lot 2, Section 17 | 7/21/2010 | CX completed | | 9/14/2010 | JoAnn Goodlow | DOI-BLM-AZ-P010-2010-027-CX | | | DOI-BLM-AZ-P010-2010-028-CX | Yavapai County Board of Supervisors Right-of-Way Grant Renewal | Bob White Road, Mule Deer Road, Sage Brush Drive; T. 11 N., R. 2 E., Section 9 NESW | 7/19/2010 | CX Completed | | 8/2/2010 | Hillary Connor | DOI-BLM-AZ-P010-2010-0028-CX | | | DOI-BLM-AZ-P010-2010-029-CX | Qwest Corporation -- Communication Site Renewal | G&SR Meridian, T. 3 N., R. 3 W., Section 27, Tract 37. | 8/2/2010 | CX Completed | | 8/16/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-0029-CX | | | DOI-BLM-AZ-P010-2010-030-CX | American Tower Corporation -- Right of Way Renewal | G&SR Meridian, T. 7 N., R. 2 W., Section 9 SWSW. | 7/26/2010 | CX Completed | | 8/6/2010 | Hillary Connor | DOI-BLM-AZ-P010-2010-0030-CX | | | DOI-BLM-AZ-P010-2010-031-CX | Dyno Nobel Burt Inc, Permit Renewal (Section 302, Storage and Stockpile | G&SR Meridian, T. 12 N., R. 1 E., Section 23 E2SE; G&SR Meridian, T. 12 N., R 1 E., Section 24, W2SW. | 7/23/2010 | CX Completed | | 8/3/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-0031-CX | | | DOI-BLM-AZ-P010-2010-032-CX | ROW Grant Renewal and Conversion to FLPMA | . 16 N., R. 1 E., Section 21 SENE and T. 15 N., R. 2 W., Section 12 S2SW, SWSE. | 8/23/2010 | CX Completed | | 9/24/2010 | Hillary Conner | DOI-BLM-AZ-P010-2010-032-CX | | | DOI-BLM-AZ-P010-2010-033-EA | Turner Grazing Permit Renewal | T1N, R7W | 8/24/2010 | EA In Progress | | | James Holden | | | | DOI-BLM-AZ-P010-2010-034-CX | Airpark Jamboree | T6N, R2W, S 10,14,15,22,23,26,27 | 9/15/2010 | CX Completed | | 10/1/2010 | Mary Skordinsky | DOI-BLM-AZ-P010-2010-034-CX | | | DOI-BLM-AZ-P010-2010-035-DNA | Green Gulch Grazing Lease Transfer | T13N, R1E, S8 | 9/29/2010 | DNA Completed | | 10/5/2010 | James Holden | DOI-BLM-AZ-P010-35-DNA GreenGulch | |
 |
Lower Sonoran Field Office · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P020-2010-001-CX | Sonoran Solar Energy Project Preliminary Geotechnical Exploratory Program | T2S, R3W, S13, aliquot; T2S, R3W, Sec 22 aliquot; T2 S, R3W, Sec 23 aliquot; and T2S, R3W, Sec 24 aliquot (G&SRM) | 11/10/2009 | CX completed | | 11/10/2009 | Kathleen Depukat | DOI-BLM-AZ-P020-2010-001-CX | | | DOI-BLM-AZ-P020-2010-002-CX | AZ2S9W28001 AML – Backfilling AML Shaft | T2S, R9W, Sec28, NWNE | 11/12/2009 | CX completed | | 11/13/2009 | Matt Plis | DOI-BLM-AZ-P020-2010-002-CX | | | DOI-BLM-AZ-P020-2010-003-CX | Greater Phoenix Orienteering Club Event | T1S, R4W, Sec29-33; T2S,R5WSec4 | 1/9/2010 | CX completed | | 11/24/2009 | Jack Ragsdale | Please contact Leah Baker at 623.580.5656 to obtain a copy of this document | | | DOI-BLM-AZ-P020-2010-004-DNA | DHS, U.S. Customs and Border Protection - SBInet Towers | T14S, R5W, Sec15, SSE, T. 14 S., R. 6 W., sec. 16, SSW | 1/4/2010 | DNA Completed | | 1/19/2010 | Jim Andersen | DOI-BLM-AZ-P020-2010-004-DNA | | | DOI-BLM-AZ-P020-2010-005-CX | Kilauea Crushers Mineral Materials Exploration Permit (Estrella), Mineral Materials Exploration and Sampling | T1 S, R2W, S31, SW | 1/20/2010 | CX completed | | 12/22/2010 | Dave Eddy | DOI-BLM-AZ-P020-2010-005-CX | | | DOI-BLM-AZ-P020-2010-006-CX | Kilauea Crushers Mineral Materials Exploration Permit (Buckeye Hills) Mineral Materials Exploration and Sampling | T2S, R3W, S6, T2S, R4W, S1 | 1/20/2010 | CX completed | | 1/27/2010 | Dave Eddy | DOI-BLM-AZ-P020-2010-006-CX | | | DOI-BLM-AZ-P020-2010-007-CX | Idazona Mines AML, Backfilling AML Features | T2S, R6W, S 17, 18 & 19 | 2/16/2010 | CX completed | | 2/17/2010 | Matt Plis | DOI-BLM-AZ-P020-2010-007-CX | | | DOI-BLM-AZ-P020-2010-008-CX | Dixie Mine AML, Backfilling AML Features | T2S, R8W, S12 | 2/16/2010 | CX completed | | 2/17/2010 | M. Plis | DOI-BLM-AZ-P020-2010-008-CX | | | DOI-BLM-AZ-P020-2010-009-DNA | Fiber Optic Line SR85 Why to OPCNM | T13S, R5W, S 25 & 35, T14S, R5W, S 2, 11 & 14 | 3/3/2010 | DNA Completed | | 3/8/2010 | Jim Andersen | DOI-BLM-AZ-P020-2010-009-DNA | | | DOI-BLM-AZ-P020-2010-010-DNA | Arizona Pacific Mineral Materials Sale | T4S, R8E, S 12 & 13, T4S, R9E, S 7 & 18 | 3/4/2010 | DNA Completed | | 3/10/2010 | Dave Eddy | DOI-BLM-AZ-P020-2010-010-DNA | | | DOI-BLM-AZ-P020-2010-011-CX | Saddle Mountain AML, Backfilling AML Features | T2N, R7W, S 31, S1/2 | 3/10/2010 | CX completed | | 3/11/2010 | Matt Plis | DOI-BLM-AZ-P020-2010-011-CX | | | DOI-BLM-AZ-P020-2010-012-CX | Humane Borders Land Use Permit Renewal | T13S, R6W, S15 NWNE, T14S, R5W, S3, Lot 3 and NESE | 5/17/2010 | CX completed | | 5/27/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-012-CX | | | DOI-BLM-AZ-P020-2010-013-CX | Kyle W. Hindman Sand Mine Land Conveyance | T1S, R3W, Section 9 | 5/19/2010 | CX completed | | 6/23/2010 | Matthew Magaletti | DOI-BLM-AZ-P020-2010-013-CX | | | DOI-BLM-AZ-P020-2010-014-CX | 2920 Permit -- Land Use Authorization | T6S, R7W, S5, E2E2W2 | 6/9/2010 | CX completed | | 7/22/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-014-CX | | | DOI-BLM-AZ-P020-2010-015-CX | Kilauea Crushers, LLC Mineral Materials Exploration Permit | T2S, R4W, S1 | 6/15/2010 | CX completed | | 6/16/2010 | Dave Eddy | DOI-BLM-AZ-P020-2010-015-CX | | | DOI-BLM-AZ-P020-2010-016-EA | CEMEX mineral materials sale for 300,000 tons of material (sand & gravel) | T5S, R8E, S12, S½NW¼ | 7/21/2010 | EA Completed | March 11 - March 28, 2011. Comment Period Closed. | 4/6/2011 | Karen Conrath | DOI-BLM-AZ-P020-2010-016-EA | | | DOI-BLM-AZ-P020-2010-017-CX | SRP -- 230kV Power Transmission Line ROW Renewal | T1S, R10E, Sec 34 | 7/21/2010 | CX completed | | 9/13/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-017-CX | | | DOI-BLM-AZ-P020-2010-018-CX | AZ Water Company -- Water Line ROW Renewal | T1N, R8E, Sec 1, Lot 21 | 7/21/2010 | CX completed | | 9/13/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-018-CX | | | DOI-BLM-AZ-P020-2010-019-CX | APS -- Liberty Substation to Gila Bend Substation 230kV ROW Renewal | T1S, R3W, S 18, 19, 30, 31; T2S, R3W, S 6, 7, 18, 19, 30; T1S, R4W, S13; T2S, R4W, S36; T3S, R4W, S1, 12, 23, 26, 35; T4S, R4W, S2, 11, 14, 23, 26, 35 | 7/21/2010 | CX completed | | 9/13/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-019-CX | | | DOI-BLM-AZ-P020-2010-020-CX | APS --Leonard J Hassett Extension | T2S, R2W, Sec 30 | 7/21/2010 | CX completed | | 9/13/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-020-CX | | | DOI-BLM-AZ-P020-2010-021-CX | American Towers/Quest Communications -- Communication Site ROW Renewal | Oatman Mountain, T4S, R9W, Sec 25 | 7/21/2010 | CX completed | | 9/13/2010 | JoAnn Goodlow | DOI-BLM-AZ-P020-2010-021-CX | | | DOI-BLM-AZ-P020-2010-022-EA | Walker Butte Permit Renewal -- Grazing Lease Renewal for the Walker Butte Allotment | Florence, Arizona | 7/6/2010 | EA In progress | TBD | | Andrea Felton | | | | DOI-BLM-AZ-P020-2010-023-EA | Florence Junction Permit Renewal -- Grazing Permit Renewal for the Florence Junction Allotment | Florence, Arizona | 7/6/2010 | EA In progress | TBD | | Andrea Felton | | | | DOI-BLM-AZ-P020-2010-024-EA | Hazen-Shepard Permit Renewal | Near Gillespie Dam, AZ (between Gila Bend and Buckeye) | 7/6/2010 | EA In progress | TBD | | Andrea Felton | | | | DOI-BLM-AZ-P020-2010-025-CX | Queen Valley Water Right of Way Renewal | G&SR Meridian, T1S, R1E, S34, lots 2. | 7/26/2010 | CX completed | | 8/5/2010 | Hillary Conner | DOI-BLM-AZ-P020-2010-0025-CX | | | DOI-BLM-AZ-P020-2010-026-CX | Lufthansa German Air ROW Renewal | G&SR Meridian, T3S, R1E, S31 SESE, G&SR Meridian, T3S, R1W, S27, SWSW | 7/26/2010 | CX completed | | 8/20/2010 | Hillary Conner | DOI-BLM-AZ-P020-2010-0026-CX | | | DOI-BLM-AZ-P020-2010-027-CX | APS ROW Grant Amendment (switch to a 69 kV to a 12kV Powerline) | T. 4 S., R. 9 W., Section 17 (SWSW), 18 (E2SESE, 19, 30, and 31 (all E2E2E2); T. 5 S., T. 9 W., Section 5, Lots 4. MARICOPA COUNTY | 8/23/2010 | Application Withdrawn | | N/A | Hillary Conner | n/a -- Application Withdrawn | | | DOI-BLM-AZ-P020-2010-028-EA | Kilauea Crushers LLC, Buckeye Hills Operation - mineral materials contract for 400,000 tons rock | T. 2 S., R. 3 W., Sec. 6, W½W½(part), SE¼SW¼(part), Sec. 7, NW¼NW¼(part), T. 2 S., R. 4 W., Sec. 1, E½NE¼(part), SE¼(part), S½SW¼(part), N½N½(part), SE¼NE¼(part), N½SE¼(part) | 9/2/2010 | EA In progress | TBD | | Dave Eddy | | | | DOI-BLM-AZ-P020-2010-029-CX | Dixie Mine Bat Gate | T2S, R8W, S12, NW1/4NE1/4 | 9/28/2010 | CX completed | | 10/29/2010 | Matt Plis | DOI-BLM-AZ-P020-2010-29-CX | | | DOI-BLM-AZ-P020-2010-030-CX | Yellow Medicine Butte Bat Gate | T2S, R9W, S28, NE1/4SE1/4 | 9/28/2010 | CX completed | | 10/29/2010 | Matt Plis | DOI-BLM-AZ-P010-2010-0030-CX | | | DOI-BLM-AZ-P020-2010-031-CX | Kilauea Crushers Buckeye Hills Mineral Materials Exploration Permit | T2S, R4W, S1 SW1/4NE1/4 (approximately) | 9/28/2010 | CX completed | | 1/4/2011 | Dave Eddy | DOI-BLM-AZ-P020-2010-031-CX | |
 |
Agua Fria National Monument · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P030-2010-001-EA | 2Y Storage Tank and Drinkers – Install Water Tank, Troughs | T.11N., R.3E., Sec. 1,2,3 | 12/4/2009 | EA Completed | | 1/21/2011 | Paul Sitzmann | DOI-BLM-AZ-P030-2010-001-EA | | | DOI-BLM-AZ-P030-2010-002-EA | Agua Fria River OHV Barriers – Install OHV Barriers | T.11N., R. 3E., Sec. 20 | 12/23/2009 | EA Completed | | 12/22/2010 | Paul Sitzmann | DOI-BLM-AZ-P030-2010-002-EA | | | DOI-BLM-AZ-P030-2010-003-DNA | Juniper Thinning and Pile Burning for Agua Fria National Monument | T 11N R 3E, Sec’s 21,22,25-28,33,34 | 11/10/2009 | DNA Completed | | 4/30/2010 | Brian Achziger | DOI-BLM-AZ-P030-2010-003-DNA | | | DOI-BLM-AZ-P030-2010-004-CX | Fish Depradation Project In Agua Fria River and Tributaries | Agua Fria River and Tributaries: T9N, R2E, T9N, R3E, T91/2N, R2E, T10N, R2E, T10N, R3E, T11N, R3E. Gila and Salt River Meridian | 8/25/2010 | CX Completed | | 1/13/2011 | Paul Sitzmann | DOI-BLM-AZ-P030-2010-004-CX | |
 |
Sonoran Desert National Monument · 21605 North 7th Avenue · Phoenix, AZ 85027 · (623) 580-5500 | NEPA Document Number* | Project Title*, Case File Number, and Description | Area Affected* | Date Started* | Status* | Public Comment Period (dates) | Decision Date (completion)* | Contact* | Links to Available Documents | Cooperating Agencies | | DOI-BLM-AZ-P040-2010-001-EA | BLM AZ SO Javelina Mountain Repeater Site | T. 8S., R. 1W., Sec. 9 (SDNM) | 11/9/2009 | EA/FONSI/DR | | 2/12/2010 | JoAnn Goodlow | Contact BLM Phoenix District for copy of EA | | | DOI-BLM-AZ-P040-2010-002-DNA | Colorado Mountain College SRP / Mallozzi, Special Recreation Permit | North Maricopa Mts. Wilderness | 1/22/2010 | DNA Completed | | 2/18/2010 | Dave Scarbrough | Contact BLM Phoenix District for copy of DNA | | | DOI-BLM-AZ-P040-2010-003-DNA | Colorado Mountain College SRP / Kime | North Maricopa Mts. Wilderness | 2/19/2010 | DNA Completed | | 2/24/2010 | Dave Scarbrough | DOI-BLM-AZ-P040-2010-003-DNA | | | DOI-BLM-AZ-P040-2010-004-EA | Installation of resource protection barriers in SDNM | SDNM and Goldwater Air Force Range, SW Arizona | 7/26/2010 | DR/FONSI/EA | September 15, 2010 -September 30, 2010. Comment Period Closed | 10/19/2010 | Rich Hanson | DOI-BLM-AZ-P040-2010-004-EA-FONSI-DR | | | DOI-BLM-AZ-P040-2010-005-DNA | Restoration and removal of illegal roads and surface disturbances, Table Top Wilderness | SDNM, Table Top Wilderness, SW Arizona | 8/11/2010 | DNA In Progress | | | Rich Hanson | | | | DOI-BLM-AZ-P040-2010-006-DNA | Special Recreation Permit: Church of Jesus Christ Latter Day Saints, Maricopa Stake Don Smith | Sonoran Desert National Monument, Anza NHT/Mormon Battalion Trail from Christmas Camp to Gap Well | 9/28/2010 | DNA Completed | | 10/13/2010 | Dave Scarbrough | DOI-BLM-AZ-P040-2010-006-DNA | |
 |
Legend:Area Affected - GCPNM - Grand Canyon Parashant National Monument
- VCNM - Vermilion Cliffs National Monument
- AFNM - Agua Fria National Monument
- SDNM - Sonoran Desert National Monument
- IFNM - Ironwood Forest National Monument
- LCNCA - Las Cienegas National Conservation Area
- SPRNCA - San Pedro Riparian National Conservation Area
- GBNCA - Gila Box National Conservation Area
- xxx WA - Wilderness Area
- xxx WSA - Wilderness Study Area
- xxx ACEC - Area of Critical Environmental Concern
- xxx W&SR - Wild and Scenic River Segment
- xxx NT - National Trail
- PD Land - Public Domain Land
Status - DNA in Progress - Determination of NEPA Adequacy Review
- CX in Progress - Categorical Exclusion Review
- EA in Progress - Environmental Assessment Level Analysis
- FONSI/EA available for public review - Finding of No Significant Impact/EA
- DR/FONSI/EA - Decision Record/ FONSI and EA Completed
- NOI Published - Notice of Intent to Prepare an Environmental Impact Statement Level Analysis
- DEIS in Progress - Draft EIS
- NOA for DEIS - Notice of Availability Published in the Federal Register
- FEIS in Progress - Final EIS
- NOA for FEIS - Notice of Availability Published in the Federal Register
- ROD Approved - Record of Decision
- LUPA/EA NOI Published - NOI to Prepare a Land Use Plan Amendment/EA Level Analysis
- LUPA/EA in Progress
- LUPA/FONSI/EA available for public review
- LUPA/DR/FONSI/EA - Decision Record/ FONSI and EA Completed
- LUPA/EIS NOI Published - NOI to Prepare a Land Use Plan Amendment/EIS Level Analysis
- LUPA/DEIS in Progress
- NOA for DLUPA/DEIS - NOA Published in Federal Register
- PLUPA/FEIS in Progress
- NOA for PLUPA/FEIS - NOA Published in Federal Register
- LUPA/ROD Approved
- RMP NOI Published - NOI to Prepare a Resource Management Plan/EIS
- DRMP/DEIS in Progress - Draft RMP/Draft EIS
- NOA for DRMP/DEIS - NOA Published in Federal Register
- PRMP/FEIS in Progress - Proposed RMP/Final EIS
- NOA for PRMP/FEIS - NOA Published in Federal Register
- RMP/ROD Approved
How to Get Involved:BLM encourages the public to get involved in the planning process to help determine how public lands will be managed. Involvement by everyone with an interest in public lands will help ensure the best possible plan is developed and future uses of public lands are well defined. You may participate in any of the on-going planning efforts listed above. If you have questions or would like to submit comments on a particular project, please contact the BLM Office identified above.
 |
|
|