|
The following table summarizes information contained in the BLM Anchorage Field Office National Environmental Policy Act (NEPA) document register. The printed version of this register is available for public inspection at the Anchorage Field Office, 4700 BLM Road (68th Ave & Elmore Rd), Anchorage, Alaska, during normal business hours. For information on any proposed action, contact the Anchorage Field Office at 907-267-1246 or 800-478-1263. Electronic links for completed documents are provided below, or you may write to us at BLM Anchorage Field Office, 4700 BLM Road, Anchorage, AK 99507-2599. (NOTE: For status of NEPA actions listed as "In process," please refer to FY 2011 NEPA Register.) NEPA Document Number | Case File Number | Applicant | Proposed Action | Affected Area | Status of NEPA Review | | DOI-BLM-AK-A010-2010-0060-CX | AA-92467 AA-92468 | KPU | Power transmission line and road access right-of-way | Copper River Meridian, T. 75 S., R. 91 E. | In process | | DOI-BLM-AK-A010-2010-0059-CX | AA-82261 | GTP Towers II, LLC | Re-assignment of communication facility operation and maintenance rights | Seward Meridian, T. 13 N., R. 2 W., Sec 5 | In process | | DOI-BLM-AK-A010-2010-0058- | AA-092676 | QAP General Contractors | Mineral materials sale | Seward Meridian, T. 33 N., R. 35 W., Sec. 31, S½ | In process | | DOI-BLM-AK-A010-2010-0057-CX | AA-05964 | U.S. Forest Service | Withdrawal extension | Sixmile Creek Recreation Area Seward Meridian, T. 7 N., R.1 E. (within); T. 8 N., R.1 E. (within); T. 8 N., R.1 W (within); T. 9 N., R.1 W. (within); (473 acres) | In process | | DOI-BLM-AK-A010-2010-0056-CX | | Alaska Dept. of Fish and Game | Rural gas right-of-way; MLA Recreation and Public Purposes Lease; FLPMA right-of-way | MLA R&PP Lease: SM., T.13N., R.2W., Sec 6 FLPMA ROW: SM., T.13N., R.2W., Sec 1., | In process | | DOI-BLM-AK-A010-2010-0055-CX | AA-012479 | Alaska Dept. of Fish and Game | Rural gas right-of-way; MLA Recreation and Public Purposes Lease; FLPMA right-of-way | MLA R&PP Lease: SM., T.13N., R.2W., Sec 6 FLPMA ROW: SM., T.13N., R.2W., Sec 1., | In process | | DOI-BLM-AK-A010-2010-0054-CX | AA-012918 | Alaska Dept. of Fish and Game | Rural gas right-of-way; MLA Recreation and Public Purposes Lease; FLPMA right-of-way | MLA R&PP Lease: SM., T.13N., R.2W., Sec 6 FLPMA ROW: SM., T.13N., R.2W., Sec 1., | In process | | DOI-BLM-AK-A010-2010-0053-CX | AA-03060 | U.S. Forest Service | Withdrawal extension | Juneau Falls Recreation Area Seward Meridian, T. 5 N., R. 4 W., Sec. 13, SE1/4SW1/4, SW1/4SE1/4; Sec. 24, W1/2NE1/4, E1/2NW1/4, NE1/4SW1/4, NW1/4SE1/4 (340 acres) | In process | | DOI-BLM-AK-A010-2010-0052-CX | AA-03060 AA-05934 AA-05964 | U.S. Forest Service | Withdrawal extension | Seward Meridian, AK Kenai River Recreation Area (AA-05964): T.5 N., R. 4 W., Secs. 27, 28, 33, 34, 35, 36. (350 acres) Russian River Campground Area (AA-03060): T. 5 N., R. 4 W., Sec. 33 N1/2; NE1/4SE1/4; Sec. 34 SW1/4NE1/4, NW1/4, N1/2SW1/4, NW1/4SE1/4 (within) (340 acres) Lower Russian Lake Recreation Area (AA-05934): T. 4 N., R. 4 W., Sec. 3, W1/2W1/2; Sec. 4, E1/2E1/2, SW1/4SE1/4, W1/2NE1/4, NW1/4SE1/4, E1/2SW1/4 (within); Sec. 9, NE1/4NE1/4, W1/2NE1/4, NW1/4SE1/4, E1/2NW1/4, NE1/4SW1/4 SW1/4SE1/4, SE1/4SW1/4 (within); Sec. 10, NW1/4NW1/4 (within); Sec. 16, SE1/4SW1/4, NE1/4SW1/4, W1/2NE1/4, SE1/4NW1/4, W1/2SW1/4 (within); Sec. 21, NE1/4NW1/4, NW1/4NW1/4 (within). T. 5 N., R. 4 W., Sec. 33, SE1/4SE1/4 (within); Sec. 34, S1/2S1/2, NE1/4 (within), SE1/4NE1/4 (within) (1,165 acres) | In process | | DOI-BLM-AK-A010-2010-0051-DNA | AA-032257 | XS Platinum, Inc. | Mining: Add missed claim to previously approved Mine Plan and associated NEPA | Seward Meridian, Alaska, T. 14 S., R. 75 W., Secs. 26, 35 and 36 | Completed 8/23/2010 | | DOI-BLM-AK-A010-2010-0050-DNA | AA-92403-D | Donlin Creek, LLC | Increase number of thermistors to measure permafrost temperature | Seward Meridian, Alaska, T. 27 N., R. 27 W., Secs. 22, 23, 24, 26-29 (inclusive), 31, 32, and 33; T. 27 N., R. 28 W., Secs. 35 and 36; T. 26 N., R. 29 W., Secs. 24-27 (inclusive), and 32-35 (inclusive); T. 25 N., R. 30 W., Secs. 11-21 (inclusive); T. 25 N., R. 31 W., Secs. 13, 21-24 (inclusive), and 27-32 (inclusive); T. 25 N., R. 32 W., Secs. 25, 35, and 36; T. 24 N., R. 35 W., Secs. 19-22 (inclusive), 25, 26, and 30; T. 24 N., R. 36 W., Secs. 25-29 (inclusive), and 31-34 (inclusive); T. 24 N., R. 37 W., Secs. 34, 35, and 36; T. 23 N., R. 39 W., Secs. 19, 20, and 21; T. 23 N., R. 40 W., Secs. 16, 19-24 (inclusive), 28, 29, and 30; T. 23 N., R. 41 W., Secs. 24-36 (inclusive); T. 22 N., R. 42 W., Secs. 4-7 (inclusive); T. 23 N., R. 42 W., Secs. 25, 26, 27 and 33-36 (inclusive); T. 22 N., R. 43 W., Secs. 1, 2, 11, and 12; T. 23 N., R. 43 W., Secs. 19, 20, 28, 29, 30, 32-35 (inclusive); T. 23 N., R. 44 W., Secs. 7, 17, 18, 20, 21, 22, 24-28 (inclusive); T. 23 N., R. 45 W., Secs. 7-15 (inclusive); T. 23 N., R. 46 W., Secs. 9-12 (inclusive), and 15-20 (inclusive); T. 23 N., R. 47 W., Secs. 19, 23, 24, 26-30 (inclusive), 32, 33, and 34; T. 23 N., R. 48 W., Secs. 23-26 (inclusive) (within). | Completed | | DOI-BLM-AK-A010-2010-0049-CX | AA-92481 | Ben Stevens | Overland equipment move | Section 29 NW¼, SW¼, SE¼, Section 30 NW¼NW¼NW¼, Section 32 NE¼NE¼NE¼, and Section 33 N½, Township 6 | Completed 10/15/2010 | | DOI-BLM-AK-A010-2010-0048-CX | AA-92666 | Yoshiko Abe, d.b.a. Wonderland Tours, Inc. Vancouver, B.C. | Commercial film permit | Chilkat, Ferebee and Westcreek Glaciers near Skagway, AK | In process | | DOI-BLM-AK-A010-2010-0047-DNA | AA-12497 | Anchorage Water and Wastewater Utility (AWWU) | Renew Right-of-Way for 36" water transmission main | Seward Meridian, T. 13. N., R. 2 W., Sec. 8 S1/2 S1/2; Sec. 9 SW1/4 SE1/4 S1/2 SW1/4 (within) | In process | | DOI-BLM-AK-A010-2010-0046-CX | AA-92480 | Anchorage Water and Wastewater Utility (AWWU) | Test production and observation wells | Seward Meridian, T. 13 N., R. 2 W., Sec. 30, NW 1/4 SW 1/4 | In process | | DOI-BLM-AK-A010-2010-0045-CX | AA-92482 | Alaska Dept. of Transportation and Public Facilities | Free Use Permit (gravel) | Kateel River Meridian, T. 7 S., R. 32 W., Sec. 10 S 1/2 | In process | | DOI-BLM-AK-A010-2010-0044-EA | AA-92450 | Anchorage Water and Wastewater Utility (AWWU) | Install temporary test water production well and observation well on BLM Campbell Tract Facility | Seward Meridian, T. 12 N., R. 30 W., Sec. 3, S 1/2 SW NW | In process | | DOI-BLM-AK-A010-2010-0043-CX | AA-92662 | United Utilities | Perform pre-construction activities for communication site | Seward Meridian, T. 9 S., R. 74 W., Secs. 27 & 34 | In process | | DOI-BLM-AK-A010-2010-0042-EA | | AT&T Mobility | Cellular tower construction on BLM Campbell Tract Facility | Seward Meridian, T. 12 N., R. 3 W., Sec. 3 | In process | | DOI-BLM-AK-A010-2010-0041-ROD | | U.S. Fish and Wildlife Service | Record of Decision (ROD) for adoption of USFWS EIS | Seward Meridian, T. 8 N., R. 9 W., Secs. 2, 3, 10; T. 9 N., R. 9 W., Secs. 25, 35, 36 | Completed 08/02/2010 | | DOI-BLM-AK-A010-2010-0040-DNA | | U.S. Fish and Wildlife Service | Determination of NEPA Adequacy for the USFWS Swanson River Satellites EIS | Seward Meridian, T. 8 N., R. 9 W., Secs. 2, 3, 10; T. 9 N., R. 9 W., Secs. 25, 35, 36 | Completed 08/02/2010 | | DOI-BLM-AK-A010-2010-0039-CX | | Union Oil Company of CA | Oil and Gas: Install utility poles and electric cable to run submersible pumps for production in the Swanson River Field | Seward Meridian, T. 8 N., R. 9 W., Sec. 33-34 | In process | | DOI-BLM-AK-A010-2010-0038-EA | AA-092476 | BLM | Right-of-way grant, shop/bunkhouse at Unalakleet | Kateel River Meridan, T. 18 S., R. 11 W., Sec. 34 KRM and T. 19 S., R. 11 W., Sec. 3 | In process | | DOI-BLM-AK-A010-2010-0037-EA | | BLM | Construct storage cabin at Rohn | Seward Meridian, T. 33 N., R. 28 W. | In process | | DOI-BLM-AK-A010-2010-0036-CX | A-029656, A-029657 | Conoco Phillips | Oil and Gas: expand 5 existing federal gas well pads in the Beluga River Unit to allow for installation of 7 compressors | Seward Meridian, T. 12 N., R. 10 W., Kenai Peninsula (Tyonek is nearest town) | In process | | DOI-BLM-AK-A010-2010-0035-CX | AA-092438 | Rodney Schuh | Special Recreation Permit for guiding-outfitting | Seward Meridian, T. 51 S., R. 83 W., Sec. 25 (AK Peninsula) | In process | | DOI-BLM-AK-A010-2010-0034-EA | AA-092395 | U.S. Fish and Wildlife Service | Right-of-way grant for communications site | Seward Meridian, T. 18 N., R. 68 W., Sec. 11 | In process | | DOI-BLM-AK-A010-2010-0033-EA | AA-092394 | U.S. Fish and Wildlife Service | Right-of-way grant for communications site | Kateel River Meridian, T. 24 S., R. 5 W., Sec. 16 | In process | | DOI-BLM-AK-A010-2010-0032-EA | | Willow Area Community Organization (WACO) | Right-of-way grant for recreation trails | Seward Meridian, T. 19 N., R 4 W., S1/2SW1/4 (Willow, AK) | In process | | DOI-BLM-AK-A010-2010-0031-EA | AA-092369 | Matanuska Electric Association, Inc. (MTA) | Right-of-way grant for aerial telecommunications line | Seward Meridian, T. 17 N., R. 2 E., Sec. 26, Lots 37 & 39; T. 17 N., R. 2 E., Sec. 35, Lot 16 (Eagle River to Palmer, AK) | In process | | DOI-BLM-AK-A010-2010-0030-CX | AA-016161 | Chugach Electric Association | Right-of-way authorization renewal for overhead/underground electric 230kV | | In process | | DOI-BLM-AK-A010-2010-0029-EA | | FAA | Permit for communications site | Kateel River Meridian, T. 18 S., R. 11. W., Secs. 22 & 27, KRM (Unalakleet Airstrip)T. 18 S., R. 11. W., Secs. 22 & 27 (Unalakleet Airstrip) | In process | | DOI-BLM-AK-A010-2010-0028-EA | AA-92403-A, AA-92403-D | Donlin Creek, LLC | Temporary use permit for geotech study involving trenching and boring soil for proposed buried pipeline | Seward Meridian, T. 27 N., R. 27 W., Sect. 24 to T. 22 N., R. 49 W., Sec. 12 (SW of Farewell Lake to Donlin Creek Mine) | Completed 06/4/2010 | | DOI-BLM-AK-A010-2010-0027-CX | AA-92403-B, AA-92403-C | Donlin Creek, LLC | Temporary use permit for fuel storage at Rohn and Tin Creek airstips in support of geotech study (AA-92403-A) for proposed buried pipeline | Seward Meridian, T. 26 N., R. 22 W., Sec. 33 (Rohn AA-92403-B); T. 28 N., R. 23 W., Sec. 7 (Tin Creek AA-92403-C) | Completed 05/14/2010 | | DOI-BLM-AK-A010-2010-0026-CX | AA-092374 | Pebble Limited Partnership | Right-of-Way grant renewal for a meteorological repeater tower near Iliamna Bay | Seward Meridian, T. 5 S., R. 26 W., Sec. 36, north of Williamsport (Iliamna Bay) | Completed 06/22/2010 | | DOI-BLM-AK-A010-2010-0025- | AA-092370; AA-092371; AA-092372; AA-092373; AA-092356; AA-092357; AA-092358; AA-092359; AA-092360; AA-092389; AA-092390 | City of Tenakee Springs, AK; David & Beverly Miller, Rosalia Floresca, Richard & Shelia Zagars, Rudy Ziel, Bruce Burwell, Kevin & Carlene Allred, Mark Millea, Ben Taylor | Recreation and Public Purposes (R&PP) Act leases for bathhouse and Federal Land Policy and Management Act (FLPMA) lease for residences; resolve trespass issues in Tenakee Springs, near Juneau, AK | Copper River Meridian, T. 47 S., R. 63 E., Sec. 21 (USS 1409, MSR 1-4) | In process | | DOI-BLM-AK-A010-2010-0024-CX | AA-025016 | Matanuska Electric Association, Inc. | 115kV electric transmission Right-of-Way grant renewal near Eagle River, AK | Seward Meridian, T. 14 N., R. 1 W., Secs. 19, 20, 21; T. 14 N., R. 2 W., Secs. 14, 15, 22, 23, 24 | In process | | DOI-BLM-AK-A010-2010-0023-CX | AA-092392 | USGS | Gravity and magnetometer surveys | Kateel River Meridian, T. 4 S., R. 30 W., Secs. 19, 20, 21, 22, 28; T. 5 S., R. 30 W., Secs. 4, 5, 6, 7, 8, 9; T. 5 S., R. 31 W., Secs. 1, 11, 12, 13, 14, 15, 16, 17, 18; T. 5 S., R. 32 W., Secs. 1, 2, 11, 12, 13, 14 | Completed 03/26/2010 | | DOI-BLM-AK-A010-2010-0022- | AA-077728 | BLM | Meteor Burst Communications Site | Campbell Tract Facility, Anchorage, Alaska, T. 12 N., R. 3 W., Sec 3, SM | In process | | DOI-BLM-AK-A010-2010-0021-EA | AA-092396 | BLM | American Recovery & Reinvestment Act (ARRA) project: Iditarod National Historic Trail Kaltag Trail Brushing | Kaltag, Alaska | Completed 03/12/2010 | | DOI-BLM-AK-A010-2010-0020-CX | AA-012479 AA-012918 AA-041791 | State of AK, Department of Fish & Game | Rural Gas Right-of-Way (ROW); Recreation and Public Purposes (R&PP) Lease; Federal Land Policy & Management Act (FLPMA) Right-of-Way | R&PP Lease: SM, T. 13 N., R. 2 W., Sec. 6 FLPMA ROW: SM, T. 13 N., R. 2 W., Sec. 1, E 1/2 SE 1/4 and Sec. 6, SW 1/4 SW 1/4 | In process | | DOI-BLM-AK-A010-2010-0019-CX | AA-091147 | Larry Wilmarth | Authorization for overland move from Chicken Creek to Julian Creek | SM, T. 25 N., R. 44 W., Secs. 4, 5, 9, 10, 13-15; T. 26 N., R. 44 W., Secs. 5-8, 18-20, 29, 30; T. 27 N., R. 44 W., Sec. 30; T. 27 N., R. 45 W., Secs. 17, 18, 20-23, 25-27, 30, 31. | In process | | DOI-BLM-AK-A010-2010-0018-CX | AA-092355 | BLM | American Recovery & Reinvestment Act (ARRA) project: Mark four Koyuk area trails | KRM, T. 3 S., R. 12 W.; T. 3 S., R. 13 W.; T. 5 S., R. 12 W.; T. 7 S., R. 11 W.; T. 7 S., R. 13 W. | Completed 02/25/2010 | | DOI-BLM-AK-A010-2010-0017-CX | FF-087328 | National Park Service | Renewal of communications site at Grand Singatook (Hill 3870) | KRM, T. 7 S., R. 37 W., Sec. 12 | Completed 05/10/2010 | | DOI-BLM-AK-A010-2010-0016-CX | FF-94313 | Lance Kronberger, dba Freelance Outdoor Adventures | Reauthorization of Special Recreation Permit for 10-year period. | GMU 22A, Shaktoolik, Ungalik and Golosovia River | Completed 03/18/2010 | | DOI-BLM-AK-A010-2010-0015-EA | AA-092352 | BLM | American Recovery & Reinvestment Act (ARRA) project: Construct 4 new winter safety shelters on Idtarod National Historic Trail | Foothills Summit, KRM T15S R11W Sec 17; Tolstoi Headwaters, KRM T28S R10E Sec 32; Moose Creek, SM T30N R46W, Sec 4; North Fork Innoko River crossing, KRM T18S R15E Sec 36 | Completed 01/27/2010 | | DOI-BLM-AK-A010-2010-0014-DNA | | BLM | American Recovery & Reinvestment Act (ARRA) project: Resurface Viewpoint Trail and Campbell Airstrip Trailhead parking area | Campbell Tract Facility, Anchorage, Alaska, T. 12 N., R. 3 W., Sec 3, SM | Completed 01/13/2010 | | DOI-BLM-AK-A010-2010-0013-CX | | BLM | American Recovery & Reinvestment Act (ARRA) project: Invasive Plant Species Management and Education | Salmon Lake/Unalakleet area | Cancelled | | DOI-BLM-AK-A010-2010-0012-EA | AA-087882 | BLM (Alaska Fire Service) | Authorize existing communications tower | Kateel River Meridian, T. 23 W., R. 6 W., Sec. 30, NW 1/4 (Blackburn Mtn) | In process | | DOI-BLM-AK-A010-2010-0011-DNA | AA-081686 | BLM | Red Devil Mine petroleum response (American Recovery and Reinvestment Act project) | Red Devil Mine SE 1/4, Sec. 6, T. 19 S., R. 44 W., SM | Completed 12/07/2009 | | DOI-BLM-AK-A010-2010-0010-CX | | Bruce Werba | Special Recreation Permit for commercial guiding/outfitting | Holy Cross area | CANCELLED | | DOI-BLM-AK-A010-2010-0009-CX | AA-092007 | BC Contractors, Inc. | Overland heavy equipment move, Granite Mtn to Koyuk | KRM, T. 3 S., R. 13 W., Sec. 1; T. 3. S., R. 12 W., Secs. 6, 7, 18, 19 & 30 (30 mi N of Koyuk) | Completed 12/21/2009 | | DOI-BLM-AK-A010-2010-0008-EA | AA-077471 | U.S. Coast Guard | Mayflower Island land transfer | CRM, T. 41 S. R. 67 E., Sec. 36, USS 3844 | Completed 12/11/2009 | | DOI-BLM-AK-A010-2010-0007-CX | AA-3084 | FAA | Relinquish Shuyak Air Navigation Site Withdrawal #237 | ANSW 237, T. 18 S., R. 18 & 19 W., SM | Completed 11/16/2009 | | DOI-BLM-AK-A010-2010-0006-CX | AA-092005 | AT&T Mobility | Site assessment of installation of cell phone tower | Campbell Tract Facility, Anchorage, Alaska, T. 12 N., R. 3 W., Sec 3, SM | Completed 12/11/2009 | | DOI-BLM-AK-A010-2010-0005-CX | AA-087972 | Joyce Cash, D.B.A. Alaska Indigenous Experience | Special of Special Recreation Permit for commercial guiding/outfitting | Chakachamna Lake area, T. 15 N., R. 19 W., Secs. 2, 8, 11 & 20 | Cancelled | | DOI-BLM-AK-A010-2010-0004-CX | AA-086401 | Dave Leonard | Special Recreation Permit | Alaska Peninsula, T. 51 S., R. 83 W., Sec. 29, SM | Cancelled | | DOI-BLM-AK-A010-2010-0003-CX | | Elizabeth Stergiou | Special Recreation Permit for mountain biking club | Campbell Tract Facility, Anchorage, Alaska, T. 12 N., R. 3 W., Sec 3, SM | In process | | DOI-BLM-AK-A010-2010-0002-EA | | BLM | American Recovery & Reinvestment Act (ARRA) project: Campbell Creek Science Center biomass power unit replacement | Campbell Tract Facility, Anchorage, Alaska, Seward Meridian, T. 12 N., R. 3 W., Sec 3 | Completed 12/11/2009 | | DOI-BLM-AK-1220-2010-0001-EA | | BLM | American Recovery & Reinvestment Act (ARRA) project: Bridge extension & riparian restoration | Campbell Tract Facility, Anchorage, Alaska, Seward Meridian, T. 12 N., R. 3 W., Sec 3 | Completed 12/31/2009 | NEPA Actions Still In Process and Started in Previous Fiscal Years | | DOI-BLM-AK-1410-2009-0024-CX | AA-91987 | Fred Sagoonick, d.b.a. Western Alaska Sawmill | Timber sale | T. 12 S., R. 9 W., Sec. 31, SESWSE 5 ac.; T. 13 S., R. 9 W., Sec. 6, NWNWNW 1 ac.; T. 13 S., R. 10 W., Sec. 1, NENE 1 ac. | Completed 12/04/2009 | | DOI-BLM-AK-1410-2009-0023-EA | AA-087913 | Kenai Baptist Church | Reversionary interest in Recreation & Public Purposes patented property | T. 6 N., R. 11 W., Sec. 31, Lot 118, SM (Kenai Peninsula, AK) | Completed 12/29/2009 | | DOI-BLM-AK-1410-2009-0022-CX | AA-091196 | Archer's Choice Media | Film permit | T. 23 N., R. 65 W., Sec. 34, KRM (Illivit Mtns, near Stuyahok/Holy Cross) | Completed 09/11/2009 | | DOI-BLM-AK-1410-2009-0021-CX | | BLM | Salmon Lake Campground access road improvement | T. 6 S., R. 31 W., Sec. 33, KM (north of Nome, AK) | Completed 09/01/2009 | | DOI-BLM-AK-1410-2009-0020-CX | AA-091678 | TerraSond | Temporary use permit | USS 1602, Tract A, T. 5 S., R. 15 W., SM (Cook Inlet, AK) | Completed 09/11/2009 | | DOI-BLM-AK-1410-2009-0019-CX | AA-091672 | Alaska Pipeline Company | Right-of-way grant | T. 5 N., R. 7 W., Secs. 5 & 6; T. 6 N., R. 6 W., Secs. 2, 3, 9, 10, 16, 17, 19 & 20; T. 6 N., R. 7 W., Secs. 24, 25, 26, 27, 32, 33 & 34; T. 7 N., R. 5 W., Secs. 2, 3, 9, 10, 16, 17, 19, 20 & 30; T. 7 N., R. 6 W., Secs. 25, 35, & 36; T. 8 N., R. 4 W., Secs. 4, 5, 8, 17, 18, 19 & 30; T. 8 N., R. 4 W., Secs. 25, 35 & 36; T. 9 N., R. 4 W., Secs. 2, 10, 11, 15, 21, 22, 28 & 33; T. 10 N., R. 4 W., Secs. 24, 25, 35 & 36, SM (Kenai Peninsula, AK) | Completed 09/25/2009 | | DOI-BLM-AK-1200-2009-0017-CX | FF-086238 | Western Alaska Guides, Outfitters & Expedition | Special Recreation Permit renewal guide | Drainages of Ungalik, Shaktoolik, Inglutalik & Koyuk rivers (Seward Peninsula, AK) | Completed 08/13/2009 | | DOI-BLM-AK-1430-2009-0016-CX | AA-008319 | Chugach Electric | Right-of-way renewal | Secs. 3 & 10, T. 12 N., R. 3 W., SM (Campbell Tract, Anchorage, AK) | In process | | DOI-BLM-AK-A010-2009-0014-CX | AA-092391 | BLM | Unalakleet facility driveway maintenance and renovation | Sec. 2, T. 19 S., R. 11 W., KTM (Unalakleet, AK) | Completed 05/26/2010 | | DOI-BLM-AK-1430-2009-0013-EA | AA-091170 | Nushagak Cooperative | Installation of a communication site | Sec. 15, T. 7 S., R. 41 W., SM (Bristol Bay, AK) | In process | | DOI-BLM-AK-1430-2009-0012-DNA | | James P. Leonard | Authorization of driveway right-of-way | Sec. 5, T. 13 N., R. 1 E., SM (Eagle River, AK) | In process | | AK-010-08-EA-045 | AA-86837 | AK Department of Natural Resources | Recreation & Public Purposes lease for historical state park on Sitka causeways | Secs. 2, 3, & 32, T. 56 S., R. 63 E., CRM (Sitka, AK) | In process | AK-010-08-EIS-043 | AA-087915 | AK Department of Transportation | Land transfer to allow Sitka airport improvements | Sec. 2, T. 56 S., R. 63 E., CRM (Sitka, AK) | In process | | AK-010-08-EA-038 | AA-087915 | AK Department of Transportation | Authorization to allow filling of tidal lagoon for Sitka airport runway expansion | Sec. 2, T. 56 S., R. 63 E., CRM (Sitka, AK) | In process |
<<Back to NEPA HOME
 |
|
|