Brooks Range
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Grizzly along the Denali Highway Rafting the Gulkana National Wild River Native woman drying salmon on racks ATV rider on trails near Glennallen Surveyor
Alaska
BLM>Alaska>Field Offices>ADO>HazMat>RDM>RDM_RI/FS>AR2
Print Page
Red Devil Mine - CERCLA Administrative Record #2: RI/FS

The Comprehensive Environmental Response, Compensation, and Liabilities Act (CERCLA) requires that agencies make available to the public an Administrative Record of those documents that form the basis for selection of a response action at a site. The Administrative Record provides the basis for public participation and involvement, and provides a record for judicial review by documenting the government deliberative process.

BLM initiated a Remedial Investigation/Feasibility Study (RI/FS) of the Red Devil Mine in 2008. The documents included in this Administrative Record are for the RI/FS. Documents concerning other investigations and cleanup actions at the Red Devil Mine, including past CERCLA response actions (Administrative Record #1) can be accessed from our Red Devil Mine homepage. 

The official hard copy Administrative Record for the Red Devil Mine Site RI/FS is available for public viewing during normal business hours at the Anchorage Field Office Public Room. 



Administrative Record Index

An electronic copy of the CERCLA Administrative Record is indexed below. The documents are listed in order by date. Document date format is YYYY-MM-DD. 

Each document is in Adobe Reader 7.0 or higher .pdf format. Some files have been compressed in self-extracting .zip files. Many files are large and, depending on your computer's capability or Internet connection, may take several minutes to open. For faster access, you may want to save the file to your computer and open from there.

Portions of the documents in this electronic Record may not be fully Section 508 compliant. Please contact Project Manager Mike McCrum if you need assistance with this Record.


For more information about the Red Devil Mine Administrative Record, contact:

Mike McCrum, Red Devil Mine Project Manager, 907-271-4426

Contact Us




Red Devil Mine CERCLA Documents 2009 - Present


2014-06-25 - Final RDM Action Memorandum4869 Kb07/25/2014
2014-06-12 - RDM Project Newsletter 81138 Kb07/25/2014
2014-05-19 - BLM response to Georgetown TC65 Kb07/25/2014
2014-05-19 - BLM response to Calista Corp27 Kb07/25/2014
2014-04-04 - RDM Spring 2014 Community Meeting Summaries312 Kb07/25/2014
2014-03-21 - Georgetown TC comment letter re EE/CA989 Kb07/25/2014
2014-03-17 - Calista Corp comment letter re EE/CA35 Kb07/25/2014
2013-12-26 - RDM Project Newsletter 71409 Kb07/25/2014
2013-05-15 - RDM Project Newsletter 6491 Kb07/25/2014
2012-08-15 - RDM Project Newsletter 5295 Kb07/25/2014
2012-06-15 - RDM Spring 2012 Community Meeting Summaries413 Kb07/25/2014
2012-03-01 - RDM AFE Talking Circle Comment Summary38 Kb07/25/2014
2012-02-09 RDM Talking Circle Handout, 2012 AK Forum on the Environment1206 Kb07/25/2014
2012-01-12 - RDM Project Newsletter 4375 Kb07/25/2014
2011-08-01 - RDM Project Newsletter 3282 Kb07/25/2014
2011-05-20 - RDM Spring 2011 Community Meeting Summaries158 Kb07/25/2014
2011-03-11 - Draft Final RI/FS Workplan Part 16284 Kb07/25/2014
2011-03-11 - Draft Final RI/FS Workplan Part 2 (Appendices)23726 Kb07/25/2014
2011-02-02 - USGS OFR 2011-1035, Geophysical Investigation of RDM17342 Kb07/25/2014
2011-01-26 - RDM 2011 Public Safety Advisory180 Kb07/25/2014
2011-01-24 - Ltr from EPA, Re Cmnts of 2010 LSE Report902 Kb07/25/2014
2011-01-19 - Ltr from ADEC, Re Cmnts on 2010 LSE Report3700 Kb07/25/2014
2010-12-10 - RDM 2010 LSE Report - Part 113337 Kb07/25/2014
2010-12-10 - RDM 2010 LSE Report - Part 2 (Tables, Lab Data Pkg).zip56802 Kb07/25/2014
2010-12-06 - RDM CIP Addendum225 Kb07/25/2014
2010-11-26 - RDM Env Projects Newsletter 2602 Kb07/25/2014
2010-11-12 - 2010 LSE Field Sampling Plan.pdf7735 Kb07/25/2014
2010-10-18 - RDM Env Proj's - Intro Mtgs and Consultations Summary496 Kb07/25/2014
2010-10-13 - FAX email to EPA, Re Proposed Soil Analytical Methods651 Kb07/25/2014
2010-09-29 - Ltr from EPA, Re Cmnts on Powder House Work Plan218 Kb07/25/2014
2010-09-29 - Ltr from EPA, Re Cmnts on Draft Field Sampling Plan219 Kb07/25/2014
2010-09-17 - Ltr to ADEC, Re 2010 LSE Coordination205 Kb07/25/2014
2010-08-31 - Ltr to EPA, Re RI/FS Work Plan486 Kb07/25/2014
2010-08-27 - Ltr to ADEC, Re RI/FS Work Plan357 Kb07/25/2014
2010-08-24 - Ltr from EPA, Re RI/FS Work Plan512 Kb07/25/2014
2010-08-20 - Ltr from ADEC, Re RI/FS Work Plan435 Kb07/25/2014
2010-08-19 - Ltr from ADEC, Re RI/FS Work Plan659 Kb07/25/2014
2010-07-07 - Ltr from ADEC, Re BLM Comsumption Survey739 Kb07/25/2014
2010-06-08 - RDM RI/FS Community Involvement Plan (CIP)718 Kb07/25/2014
2010-03-30 - RDM RI/FS Project Management Plan4434 Kb07/25/2014
2010-03-29 - RDM 2009 Monitoring Report3344 Kb07/25/2014
2009-11-09 - RDM Env Projects Newsletter 1845 Kb07/25/2014

2014-02-19 Draft Engineering Evaluation/Cost Analysis for Proposed Early Action


Cover and Tables of Contents53 Kb02/18/2014
Executive Summary133 Kb02/18/2014
Section 1: Introduction113 Kb02/18/2014
Seciton 2: Site Characterization459 Kb02/18/2014
Section 3: Early Action Scope, Goals, and Objectives100 Kb02/18/2014
Section 4: Early Action Alternatives125 Kb02/18/2014
Section 5: Individual Analysis of Early Action Alternatives149 Kb02/18/2014
Section 6: Comparative Analysis of Early Action Alternatives161 Kb02/18/2014
Section 7: Recommended Early Action Alternative9 Kb02/18/2014
Section 8: References90 Kb02/18/2014
Appendix A: Analytical Data Summary Tables, 2013 RI Results 204 Kb02/18/2014
Appendix B: RDM Site ARARs and TBCs170 Kb02/18/2014
Appendix C: Hydrologic and Hydraulic Report2105 Kb02/18/2014
Appendix D: Cost Estimate97 Kb02/18/2014
Figure 1-1: Site Location771 Kb02/18/2014
Figure 2-1: Main Processing Area Site Features623 Kb02/18/2014
Figure 2-2: Outside Main Processing Area871 Kb02/18/2014
Figure 2-3: Fall 2012 Baseline SW monitoring1107 Kb02/18/2014
Figure 2-4: Red Devil Creek Arsenic, Antimony, and Mercury Sediment Sample Results864 Kb02/18/2014
Figure 4-1: Plan View, Alternative 2 – Concrete Cloth Liner1429 Kb02/18/2014
Figure 4-2: Plan View, Alternative 3 – Culvert Liner1427 Kb02/18/2014
Figure 4-3: Plan View, Alternative 4 – Excavation of Contaminated Sediment Near Tailings Pile1447 Kb02/18/2014
Figure 4-4: Details 1 & 2, Alternative 2 – Concrete Cloth Liner359 Kb02/18/2014
Figure 4-5: Details 3, 4 & 5, Alternative 3 – Culvert Liner & Headwall673 Kb02/18/2014
Figure 4-6: Details 6, 7 & 8, Alternatives 2 & 3 Dissipation Pool Conceptual Design522 Kb02/18/2014
Figure 4-7: Details 9, 10, 11, and 12 Typical Cross-Section Views, Alternative 4: Excavation of Contaminated Sediment690 Kb02/18/2014

2012-03 FINAL Draft Red Devil Mine RI Report


2012-03 Draft RDM RI Report Chapter 16063 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 28796 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 34821 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 412841 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 52106 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 6 (Risk Assessment)2032 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 7256 Kb08/17/2012
2012-03 Draft RDM RI Report Chapter 838 Kb08/17/2012
2012-03 Draft RDM RI Report Appendices1220 Kb08/17/2012
2012-08-13 FINAL Responses to EPA Comments Draft RI Report79 Kb08/17/2012
2012-08-13 FINAL Responses to ADEC Comments Draft RI Report275 Kb08/17/2012
2012-08-13 FINAL Responses to ADEC (Brewer) Comments Draft RI Report Baseline HHERA286 Kb08/17/2012
2012-08-13 FINAL Responses to ADEC (Wu) Comments Draft RI Report Baseline HHERA210 Kb08/17/2012
2012-08-13 FINAL Responses to EPA & ADEC Comments Evaluating Consumption of Wild Foods Tech Memo HHRA177 Kb08/17/2012
2012-08-13 FINAL Responses to EPA Comments Draft RI Report Baseline HHRA298 Kb08/17/2012
2012-08-13 FINAL Responses to EPA Comments Draft RI Report Baseline ERA159 Kb08/17/2012

2011-06 FINAL Red Devil Mine Work Plan


2011-06 FINAL RDM Work Plan June 2011633 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP359 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix B RAWP729 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix C QAPP528 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix D SHASP2733 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix E Air Modeling2048 Kb08/17/2012
2011-06 FINAL RDM Appendix F LSE Tables652 Kb08/17/2012
2011-06 FINAL RDM Work Plan Charts103 Kb08/17/2012
2011-06 FINAL RDM Work Plan Addendum 08-29-1184 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 1-19246 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 1-210594 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 1-3 6548 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 2-19847 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 2-29652 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 2-311852 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 2-411545 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-18560 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-28557 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-39359 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-46219 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-52834 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-68386 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-76722 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-87174 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-97174 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-107171 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-115761 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-125762 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-135758 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-146504 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-159313 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-169313 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-179313 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-189295 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-199296 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-209296 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-218397 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-228396 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-238397 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-248396 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-258396 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-268396 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-278353 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-288353 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-298353 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-305728 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-315728 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-325728 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-33501 Kb08/17/2012
2011-06 FINAL RDM Work Plan Figure 3-34743 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-110570 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-27034 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-310654 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-410944 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-57108 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-610645 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-710617 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-87063 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-910630 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-1011558 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-118751 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-1210756 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-136828 Kb08/17/2012
2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-13a7856 Kb08/17/2012

Return to Red Devil Mine CERCLA RI/FS homepage